Regional Rail Link Archives - Waking up in Geelong https://wongm.com/tag/regional-rail-link/ Marcus Wong. Gunzel. Engineering geek. History nerd. Tue, 31 Dec 2024 00:29:56 +0000 en-AU hourly 1 https://wordpress.org/?v=6.7.1 23299142 Photos from ten years ago: December 2014 https://wongm.com/2024/12/photos-from-ten-years-ago-december-2014/ https://wongm.com/2024/12/photos-from-ten-years-ago-december-2014/#comments Mon, 30 Dec 2024 20:33:00 +0000 https://wongm.com/?p=22739 D2.5014 stops for passengers at Batman Park on a southbound route 96 service

The post Photos from ten years ago: December 2014 appeared first on Waking up in Geelong.

Post retrieved by 35.215.163.46 using

]]>
It’s the last day of the year so what better time than another instalment in my photos from ten years ago series – this time it is December 2014.

On the train

Yes, still on the Regional Rail Link topic – Ballarat and Bendigo trains now had their own tracks through Footscray to Sunshine, along with their own next train displays located away from the ones showing suburban trains.

 V/Line only PIDS added to the concourse at Footscray station

But for now Geelong line services were still running along the Werribee line. Here we see a N class locomotive hauled train passing through Williams Landing.

N462 leads a down Geelong service through Williams Landing

A VLocity train passing through Laverton station.

VLocity 3VL50 leads a down Geelong service past an up Siemens train at Laverton station

And another passing through the platforms at South Kensington.

VLocity 3VL40 leads an up Geelong service along the suburban tracks at South Kensington

Which then took the crossover at the city end of the station to access the new V/Line tracks towards Southern Cross.

Up Geelong service on the suburban lines at South Kensington crosses onto the RRL tracks towards Southern Cross

Freight trains

A decade ago Pacific National still had the contract to transport grain by rail to the flour mill at Kensington. Southern Shorthaul Railroad won the contract in November 2017.

XR551 and X41 bring the loaded Kensington grain service into the goods siding at Melbourne Yard

Meanwhile down at North Geelong Yard Pacific National was busy scrapping surplus wagons – the bulk of which once transport freight that has been lost to road.

Scrapping of surplus Pacific National wagons at North Geelong Yard

Down around Geelong

The North Geelong B signal box was still hanging around a decade after it had been decommissioned in 2005, and surprisingly it hung around almost a decade longer – eventually being demolished in May 2022.

A decade of decay since decommissioning

While down in Grovedale money was getting spent on Baanip Boulevard, with a new bridge being built over the railway to link the Geelong Ring Road to the Surf Coast Highway.

Bridge piers in place for Baanip Boulevard crossing over the railway

And down at North Shore even the dive of a station was getting some attention – new asphalt!

Platforms 1 and 2 freshly resurfaced

Ding ding on the trams

Remember the ‘Melbourne Star’ observation wheel? This tram was advertising it, before the operator went broke in 2021.

B2.2100 advertising 'Melbourne Star' has now caught up on the timetable, and is ready to depart Camberwell Junction with a route 75 service towards the city

But a tourist icon that people actually patronised was the Colonial Tramcar Restaurant – it ran until 2018 when their restaurant trams were kicked off the Yarra Trams network due to safety concerns.

SW6.935 and SW6.964 lead the lunch run at the corner of Spencer and Collins Street

Another safety concern that is having to dodge cars to climb onboard tram at South Yarra station. The platform stop there wasn’t opened until 2021.

D1.3518 picks up outbound route 8 passengers at South Yarra station

Another crappy tram stop was the one at La Trobe and Swanston Street – on this December afternoon it was overwhelmed by a crowd of RMIT graduates spilling out onto the road. Platform stops were not provided along La Trobe Street until July 2024.

SW6.881 arrives to hoards of RMIT graduates at the corner of La Trobe and Swanston Street

And continuing on that theme, now we’re at Collins and Queen Street – closed in 2015 following completion of a new platform stop at Collins and William Street.

C.3003 heads west on route 109 at Collins and Queen Street

Another stop to close being the one for southbound route 96 passengers at the corner of Spencer and Flinders Street.

'Stop closing' notice for southbound route 96 passengers at the corner of Spencer and Flinders Street

Works about to start on new platform stops at Batman Park a short distance to the south.

D2.5014 stops for passengers at Batman Park on a southbound route 96 service

A few buses

A decade ago route 400 between Sunshine and Laverton was operated by plain white liveried buses – an artifact of the shared operation of the route between Westrans and Sita. Today the operations are now CDC Melbourne and Transit Systems, and the white buses are gone – they’re mostly PTV orange, with the exception of a few buses still in the old poo brown Sita corporate livery.

Plain white liveried Sita bus #130 rego BS00BO waits for route 400 passengers at Sunshine station

Another oddball bus was the British-built Optare Solos used on the SkyBus hotel shuttle service around the Melbourne CBD. Later branded as ‘SkyBus Link’, the service was discontinued in 2020 thanks to the Covid-19 pandemic, and never restored.

SkyBus hotel shuttle #36 rego 7109AO - this weird looking thing is a British-built Optare Solo

And the last bus is a Designline ‘bubble’ bus running on route 903 along Bell Street in Coburg.

Transdev bus #637 rego 7260AO heads west on a route 903 service along Bell Street in Coburg

Stuck in traffic waiting at the level crossing with the Upfield line – which was removed in June 2020.

Shattered bits of orange, red and clear plastic mark multiple crashes at the Bell Street level crossing in Coburg

Ticketing bits

Down in Geelong it was once possible to buy a ‘Short Term Ticket‘ from bus drivers rather than use a Myki card – an option removed in April 2013.

'myki is the only way to travel' sticker on the side of a McHarry's bus

While in the lead up to the November 2014 election both parties promised to cap Melbourne suburban travel to zone 1 prices, and introduce the ‘Free Tram Zone’ in the CBD.

PTV flyers onboard a tram promoting the 'Free Tram Zone'

Both starting from 1 January 2015.

'Free Tram Zone from 1 January 2015' and 'This stop is outside the Free Tram Zone' notice outside Parliament Station

But don’t think they’re giving you something for nothing – PTV was simultaneously running yet another fare evasion campaign.

Transdev / PTV branded fare evasion advertisement on the rear of a bus

As well as promoting free travel on Christmas Day.

PTV advertisement for free travel on Christmas Day at Melbourne Central station

Car parking

What’s a worse use of prime CBD land than a ground level car park? This is the ‘Golden Square’ car park at 217 Lonsdale Street, which is still a car park today.

'Golden Square' car park at 217 Lonsdale Street

And this is the ‘Safe City Car Park’ at 132 Little Bourke Street in Chinatown – which has since been turned into a pop up event space.

'Safe City Car Park' at 132 Little Bourke Street

And finally – a power station

Here we are at the main gate to Anglesea Power Station.

Main gate to the Anglesea Power Station

Located in the middle of the Anglesea Heathlands.

Looking down on the Anglesea Power Station from the lookout atop the adjacent coal mine

Next to a brown coal mine.

Dump truck returns for yet another load of overburden out of the open cut coal mine at the Anglesea Power Station

Opened back in 1969 to power Alcoa’s Point Henry smelter outside of Geelong, the smelter was closed down in July 2014 but the power station remained open pending a new owner, before it too was shut down in August 2015.

Footnote

Here you can find the rest of my ‘photos from ten years ago‘ series.

Post retrieved by 35.215.163.46 using

The post Photos from ten years ago: December 2014 appeared first on Waking up in Geelong.

]]>
https://wongm.com/2024/12/photos-from-ten-years-ago-december-2014/feed/ 6 22739
Photos from ten years ago: October 2014 https://wongm.com/2024/10/photos-from-ten-years-ago-october-2014/ https://wongm.com/2024/10/photos-from-ten-years-ago-october-2014/#comments Mon, 28 Oct 2024 20:30:00 +0000 https://wongm.com/?p=22563 Another instalment in my photos from ten years ago series – this time it is October 2014. Trains I’ve been posting about progress on Regional Rail Link for a few years now, and finally it’s the big day – VLocity VL09 was the first “proper” test train to run along the new tracks from Deer […]

The post Photos from ten years ago: October 2014 appeared first on Waking up in Geelong.

Post retrieved by 35.215.163.46 using

]]>
Another instalment in my photos from ten years ago series – this time it is October 2014.

Trains

I’ve been posting about progress on Regional Rail Link for a few years now, and finally it’s the big day – VLocity VL09 was the first “proper” test train to run along the new tracks from Deer Park towards West Werribee.

VLocity VL09 headed along the RRL tracks at Deer Park Junction

However it wasn’t the actual first train to use the line – a few months earlier a super heavy “consolidation train” spent a few days driving back and forth along the line, simulating the load of multiple passenger trains in order to bed down the brand new track.

Also this month the brand new station at Waurn Ponds in Geelong’s southern suburbs opened.

6-car VLocity set awaiting departure time from Waurn Ponds

But it was a bare bones operation, with just a single platform, and a short siding down the line to allow terminating trains to shunt clear of services continuing to Warrnambool.

Holding siding for Waurn Ponds station, located west of Anglesea Road

Nearby Baanip Boulevard was also under construction – a link between the recently completed Geelong Ring Road and the Surfcoast Highway.

Looking east along Baanip Boulevard towards Ghazeepore Road and Waurn Ponds station

Since then Waurn Ponds gained a second platform in 2022, the short holding siding has been replaced by a six road train stabling yard past the cement works, and 8 kilometers of track between South Geelong and Waurn Ponds has been duplicated.

Terrorism scaremongering

A decade ago the government decided to ratchet up the National Terrorism Threat Level from medium to high, and in return the City Loop railway stations were blanketed in ‘If you see something, say something’ scaremongering.

'If you see something, say something' scaremongering blankets Flagstaff station

We also lost our rubbish bins at railway stations, and the recent installed lockers at Flinders Street Station were shut down.

Recently installed lockers at Flinders Street Station now out of use

The bins eventually returned but now see through, with the exception of Southern Cross Station, which still lacks them.

And things that are gone

A decade ago the LED matrix next train displays were still a common sight outside of the CBD.

When trains run late, the next train displays show them out of order

Since 2018 the majority of them have been replaced by modern LCD screens.

Next up, we have an Alstom Comeng arrives into an almost new West Footscray platform 1 with an up Sunbury service.

Alstom Comeng arrives into West Footscray with an up Sunbury line service

Now numbered platform 2, a third turnback platform has since been constructed as part of the Metro Tunnel project.

And finally, the view onboard an EDI Comeng train.

Onboard an almost empty EDI Comeng train

The windbreakers and 15 seats around the doors of each carriage were removed in 2015, to make more room for standing passengers.

Trams

I headed out to Victoria Gardens in Richmond to check out the new route 12 terminus – opened in July 2014 after route 112 from West Preston to St Kilda was split into route 11 from West Preston to Victoria Harbour, and route 12 from St Kilda to Victoria Gardens.

A1.248 and A1.239 shunt at the route 12 terminus at Victoria Gardens

Also ongoing was the rebuilding of recently completed tram stops in the Melbourne CBD so their platform heights met new standards.

Resurfacing works almost completed at the south end of the Southern Cross Station platform stop on Spencer Street

And in Ascot Vale I revisited a tram stop that landed me in the newspaper for tracking the ongoing procession of motorists who crashed into it.

Such a long time with no crashes - this time only three panels taken out

Buses

A decade ago Sita was still running clapped out high floor buses on services around Sunshine, complete with paper destination signs as they didn’t want spend the money updating the old fashioned destination blind.

Sita high floor bus #63 rego 2363AO on a route 428 service in Sunshine

While a much more salubrious bus service was the privately operated ‘SuitJet’ express bus to the Melbourne CBD.

'SuitJet' liveried Cobb and Co coach #352 rego 9054AO at William and Little Collins Street

Launched in August 2014 with services from Point Cook, Eltham, Doreen, Mernda and Templestowe, there were few takers for the $30 return fare, and the service shut down a few weeks later.

And something else

Something that always intrigued me was the handful of houses left standing in the middle of the Victoria University car park in Footscray.

David Street used to be lined with houses, now just a car park

I eventually got around to writing about them in 2018, only for the State Government to announce in 2019 that the new Footscray Hospital would be built on the site. Today the houses are gone, replaced by a 10-storey glass and concrete tower.

Footnote

Here you can find the rest of my ‘photos from ten years ago‘ series.

Post retrieved by 35.215.163.46 using

The post Photos from ten years ago: October 2014 appeared first on Waking up in Geelong.

]]>
https://wongm.com/2024/10/photos-from-ten-years-ago-october-2014/feed/ 5 22563
Photos from ten years ago: September 2014 https://wongm.com/2024/09/photos-from-ten-years-ago-september-2014/ https://wongm.com/2024/09/photos-from-ten-years-ago-september-2014/#comments Mon, 23 Sep 2024 21:30:00 +0000 https://wongm.com/?p=22467 Another instalment in my photos from ten years ago series – this time it is September 2014. Regional Rail Link Yep, I’m at it again, following the progress on the Regional Rail Link project. At Footscray the widened railway cutting through Fordham Reserve had been partially reinstated. Right up to abandoned Franco Cozzo showroom. The […]

The post Photos from ten years ago: September 2014 appeared first on Waking up in Geelong.

Post retrieved by 35.215.163.46 using

]]>
Another instalment in my photos from ten years ago series – this time it is September 2014.

Regional Rail Link

Yep, I’m at it again, following the progress on the Regional Rail Link project.

At Footscray the widened railway cutting through Fordham Reserve had been partially reinstated.

Fordham Reserve partially reinstated atop the RRL cutting

Right up to abandoned Franco Cozzo showroom.

Patch of green retained between the RRL cutting and land acquired for the track expansion

The backdrop is now filled with new apartment blocks, and the Franco Cozzo site has been turned into the Moon Dog brewery.

While down the line, trees marked the fenced off site of what used to be David Matthews Park.

Trees from the former David Matthews Park still in place, but everything is fenced off

That park has since been sold off for development.

Out in Albion brand new steel noise walls line the rail corridor parallel to Forrest Street.

Steel noise walls line the railway parallel to Forrest Street

A decade later they’re now hidden behind a row of gum trees.

A short distance away at Ardeer station a gravel platform welcomed passengers – along with a two hour wait for the next train, a mere 15 kilometres from the Melbourne CBD.

Ardeer station now hidden on both sides by steel noise walls

Thankfully the platforms have since been resurfaced with asphalt, and trains now stop every 20 minutes.

And finally – work had finally started at the future site of Caroline Springs station.

Earthworks at what looks to be the future site of Caroline Springs station

The station was eventually opened to passengers in January 2017.

Terrorism fears

In September 2014 Public Transport Victoria yanked the rubbish bins from Melbourne railway stations as a response to the “increased terror alert level”.

Rubbish and recycling bins removed from Flinders Street Station

With the response from slovenly passengers being to just throw their rubbish on the ground instead.

Rubbish bins also removed from Flagstaff station

The bins eventually returned in March 2015 as transparent plastic bags that resembled a scrotum, with the exception of Southern Cross Station – where they have never returned.

Penalty Fares scaremongering from PTV

August 2014 was the introduction of a new on-the-spot ‘Penalty Fares’ regime.

PTV advertising the new on-the-spot 'Penalty Fares' regime at North Melbourne station

It allowed passengers caught travelling without a without a valid ticket to pay an on-the-spot penalty fare of $75 by credit card, instead of being issued with a $223 infringement notice that arrived in the mail a few weeks later.

More PTV advertising at Southern Cross Station for the new on-the-spot 'Penalty Fares' regime

As you might expect, fare evaders worked out it was cheaper to just pay the $75 penalty if you did get caught, and so the scheme was terminated in January 2017.

More Melbourne Airport Rail Link propaganda

With the lead up to the 2014 State Election, the Napthine Government ramped up their ‘Moving Victoria’ campaign, promoting their unfunded ‘Melbourne Rail Link‘ project.

'From plane to train in 25 minutes' propaganda for the soon abandoned 'Melbourne Airport Rail Link' project at Southern Cross Station

Covering Southern Cross Station with ‘From plane to train in 25 minutes’ propaganda.

'Step towards the future Melbourne Airport Rail Link' propaganda on the main steps to the Bourke Street bridge at Southern Cross Station

On the big screen at Flinders Street Station.

The unfunded rail link to Melbourne Airport is also feature in the 'Moving Victoria' campaign propaganda

Plastering propaganda stickers on the back of train seats.

'Moving Victoria' propaganda stickers on the back of train seats, spruiking the Melbourne Rail Link project

On signs at railway stations.

'Building a rail line to Melbourne Airport' propaganda at Albion station

And on billboards, like this one beside Ballarat Road in Albion.

Alstom Comeng 602M departs Albion station

But as you might have guessed, the Melbourne Rail Link project went nowhere, construction of the Metro Tunnel started a few years later and is almost finished, and work on the Melbourne Airport Rail project has been stop-start.

Level crossings that are gone

Level crossing removals in Melbourne were few and far between, so I didn’t think much about it when I photographed an X’Trapolis train departing Bayswater station on the Belgrave line.

X'Trapolis 137M departs Bayswater station on the up

Or this Comeng train departing Essendon station on the Craigieburn line.

EDI Comeng 473M heads for the city, crossing the Buckley Street level crossing at Essendon

But in 2017 the level crossings at Mountain Highway and Scoresby Road at Bayswater were replaced with rail under road bridges, and in 2018 the Buckley Street level crossing in Essendon was replaced by a road under rail bridge.

Before the West Gate ‘Tunnel’

Another project that didn’t exist a decade ago was the West Gate ‘Tunnel’.

Dynon Road through West Melbourne used to be two lanes in each direction.

SkyBus articulated bus #95 rego BS00OH heads across the Dynon Road bridge

With an empty paddock beside the railway bridge.

Former site of the Creek Siding, this section is now open space

And you could see the sky above Footscray Road.

Transdev bus #439 rego 9039AO heads west on Footscray Road towards the depot at Footscray

But now all three sites are covered by a tangle of freeway overpasses forming what is supposedly a ‘tunnel’, unsolicited proposal conceived by Transurban as a way to increase profits to their shareholders.

V/Line around the place

Just another view of Southern Cross Station, with work on the 699 Bourke Street development underway.

VLocity VL18 and classmate head into Southern Cross platform 8 via the new Country Bypass track

Since then the original purple and green VLocity livery is no more, and only a single Sprinter railcar is left in the red and yellow ‘cheeseburger’ livery.

Locomotive hauled carriages were also still being shunted out on peak hour runs.

Three shunters wave to the driver as carriage set SSH26 is moved across to the platforms at Southern Cross

The last of the H sets was withdrawn in February 2024, with the N sets soon to follow.

The one thing I did expect to see go was A66 leading a Shepparton service through Moonee Ponds.

A66 leads a late running down Shepparton service through Moonee Ponds

The fleet of A class locomotives are now with railway heritage groups, and the Shepparton service has been exclusively VLocity trains since 2022.

Ding ding on the trams

The brand new E class trams entered service in November 2013, and were now starting to dominate route 96 services.

E.6005 picks up citybound route 96 passengers at South Melbourne

The older D2 class trams being demoted to route 19 services, including one plastered in ‘E class trams on route 96’ advertising.

D2.5004 advertising new E class trams on route 96, but headed south  on route 19 along Elizabeth Street towards Flinders Street

The tram allocations are the same today, despite the low floor trams lacking any platform stops on Sydney Road.

Melbourne’s prototype high floor light rail vehicles from 1985 were also still in service.

B1.2002 heads east on route 11 at Collins and Spencer Streets

Both were withdrawn a few years later, and eventually scrapped.

Speaking of platform stops, the only recently constructed tram stops in the Bourke Street Mall were closed, so they could rebuilt to a revised platform height.

Platform stop resurfacing works at Bourke and Elizabeth Streets

The Colonial Tramcar Restaurant was still trundling around the streets of Melbourne.

SW6.935 heads back into the city along Clarendon Street in South Melbourne

The service last ran in October 2018, when Yarra Trams banned the fleet of the network citing safety concerns.

Another W class tram had been turned into the ‘Tram Bar‘ at the Arts Centre.

SW6.969 converted in a bar, located outside the Arts Centre

Opened in 2011, the tram came and went with the seasons, until permanently closed in January 2015.

And finally, what was then an unremarkable photo of trams at Domain Interchange on St Kilda Road.

Z3.123 stops in the side platform at Domain Interchange with a southbound route 8 service, as a classmate continues down St Kilda Road

Rebuilt in 2013 at great expense to modern accessible standards, in 2018 the interchange was closed to make way for the construction of Anzac station, with route 58 trams being diverted onto a new alignment via Toorak Road, pending the completion of a replacement tram stop in December 2022.

And forgotten bus companies

I didn’t realise it at the time, but a decade ago I photographed a long list of bus companies that no longer exist.

Sita Bus Lines used to use plain white buses on the route 400 service to Melbourne’s prisons.

Sita bus #129 rego BS00BT outside Ardeer station on route 400 to Laverton

They were bought by Transit Systems in 2019, but their clapped out poo brown and orange buses can still be seen the western suburbs.

East West Bus Company once ran bus sources in the northern suburbs, as a joint venture between Dysons Group and Reservoir Bus Company.

East West Bus Lines bus #809 rego 7379AO on a route 561 service along Newlands Road

The joint venture was taken over by Dysons in February 2014, with the East West brand phased out in 2019.

Tullamarine Bus Lines once ran bus routes around Moonee Ponds and Airport West.

Tullamarine Bus Lines #22 rego 1122AO on a route 477 service arrives at Essendon station

They were acquired by ComfortDelGro Corporation in 2018, and merged into the operations of CDC Melbourne.

Moonee Valley Coaches was another bus operator in the inner north.

Moonee Valley Coaches bus #78 rego 2278AO on route 503 at Essendon station

They were acquired by Dyson Group in 2024.

Kastoria Bus Lines is another smaller operator in the north-western suburbs.

Kastoria Bus Lines bus #49 rego BS00AX on route 476 at Essendon station

They lost out in the recent Metropolitan Zero Emission Bus Franchise process, and will be taken over by CDC Melbourne from 2025.

I also found a Melbourne Visitor Shuttle bus on St Kilda Road.

Melbourne Visitor Shuttle bus #78 rego 6678AO turns from Domain Road onto St Kilda Road

Funded by the City of Melbourne, the service was discontinued in 2017 after competition from the Free Tram Zone.

And City Sightseeing Melbourne once ran a hop-on hop-off tourist service with open-top double decker buses.

Melbourne City Sightseeing bus 9353AO pauses outside the National Gallery of Victoria on St Kilda Road

They suspended operations in March 2020 thanks to Covid-19, and are yet to restart operations.

And a final word

Remember Melbourne Bike Share, with bikes that needed to be pedaled, and docks to return them to?

Melbourne Bike Share users head down a bike lane

The service was withdrawn in 2019.

And what about yellow taxis?

New and old: original yellow taxi beside a new silver one

A common sight since introduced by Jeff Kennett in the 1990s, the requirement was dropped in 2013 as part of the legalisation of Uber and other so called “ridewhare” services.

Footnote

Here you can find the rest of my ‘photos from ten years ago‘ series.

Post retrieved by 35.215.163.46 using

The post Photos from ten years ago: September 2014 appeared first on Waking up in Geelong.

]]>
https://wongm.com/2024/09/photos-from-ten-years-ago-september-2014/feed/ 16 22467
Off-peak services and the Metro Tunnel https://wongm.com/2024/09/off-peak-services-metro-tunnel-melbourne/ https://wongm.com/2024/09/off-peak-services-metro-tunnel-melbourne/#comments Mon, 16 Sep 2024 21:30:00 +0000 https://wongm.com/?p=22461 Ever since the Metro Tunnel was first announced, the big question has been “how many trains will they actually run through it off-peak”. Well, there still isn’t an answer to it, but the 2022 Melbourne Airport Rail business plan does give some hope that it’s something more than the pitiful service currently provided on the […]

The post Off-peak services and the Metro Tunnel appeared first on Waking up in Geelong.

Post retrieved by 35.215.163.46 using

]]>
Ever since the Metro Tunnel was first announced, the big question has been “how many trains will they actually run through it off-peak”. Well, there still isn’t an answer to it, but the 2022 Melbourne Airport Rail business plan does give some hope that it’s something more than the pitiful service currently provided on the Sunbury line.

'More trains across Melbourne' banner outside the City Square site

Some background

Early government media releases used generic language such as:

“This project will create space to run more trains, more often, right across Melbourne. We’re getting it done.” said Premier Daniel Andrews.

As well as:

“We know these changes will be disruptive but we need to get on and build the Metro Tunnel – so we can deliver the frequent, reliable, turn-up-and-go transport system passengers need.” said Minister for Public Transport Jacinta Allan.

The only hard figures being an increase in peak capacity.

'More trains in and out of the city' poster outside the City Square construction site

And the Melbourne Metro Program “Business Case Baseline” document dated February 2016 showing half of off-peak trains terminating at West Footscray.

HCMT set 26 stopped at West Footscray platform 2 on the up

Leaving Sunshine as a station where V/Line services outnumber ‘Metro’ ones.

But those pathetic sounding numbers didn’t actually reflect the service that the government intended to provide through the Metro Tunnel – a spokesperson ringing up blogger Daniel Bowen and telling him it was just a “base case” and not a service plan – which just left us all in the dark as to what the Metro Tunnel would deliver.

But is this it?

In September 2022 the Victorian Government published the Melbourne Airport Rail business case, with a 296 page main report, and a 413 pages of appendices.

Melbourne Airport Rail propaganda wall still in place at Metro Tunnel HQ for now

And on page 11 of the appendices is what we’ve all been waiting for – a proposed service specification for the Metro Tunnel.

The assumed service specification of each option is summarised in the tables below. Note these assumed service specifications are for the purpose of comparing the options only. All changes to the Base Case under each option are highlighted orange.

The number of trains due to use the Metro Tunnel before the opening of the Melbourne Airport line.

Peak Hour Peak 2-hour Interpeak Offpeak
West Corridor 18 36 12 12
Sunbury 6 12 3 3
Watergardens 6 12 3 3
Sunshine 3 6 3 3
West Footscray 3 6 3 3
Airport 0 0 0 0
East Corridor 18 36 12 12
Pakenham 9 18 3 3
Clyde 9 18 3 3
Westall 0 0 6 6

And after the Melbourne Airport line has been completed.

Peak Hour Peak 2-hour Interpeak Offpeak
West Corridor 18 36 12 12
Sunbury 6 12 3 3
Watergardens 6 12 3 3
Sunshine 0 0 0 0
West Footscray 0 0 0 0
Airport 6 12 6 6
East Corridor 18 36 12 12
Pakenham 9 18 3 3
Clyde 9 18 3 3
Westall 0 0 6 6

So if the above is to be believed, the Sunbury line is in line for a massive off-peak service increase once the Metro Tunnel opens:

  • Sunbury – twice as many trains, from every 40 minutes to every 20 minutes,
  • Watergardens – twice as many trains, from every 20 minutes to a ‘turn up and go’ 10 minute frequency,
  • Sunshine – three times as many trains, with a ‘turn up and go’ 10 minute frequency, with three more trains slotted in between,
  • West Footscray – four times as many trains, with one every 5 minutes.

And once Melbourne Airport line opens, things will become even better – the Sunshine and West Footscray shortworkings will be extended through to Melbourne Airport, providing a 5 minute off-peak frequency to the Sunbury line as far as Sunshine.

Now we just need to hope that this is what actually gets delivered!

Post retrieved by 35.215.163.46 using

The post Off-peak services and the Metro Tunnel appeared first on Waking up in Geelong.

]]>
https://wongm.com/2024/09/off-peak-services-metro-tunnel-melbourne/feed/ 14 22461
A history of nine car long V/Line trains https://wongm.com/2024/09/history-nine-car-vline-trains/ https://wongm.com/2024/09/history-nine-car-vline-trains/#comments Mon, 02 Sep 2024 21:30:00 +0000 https://wongm.com/?p=22395 I realised the other day I’ve never written a complete piece about the history of V/Line operating nine car long trains – so here goes. In the beginning The story starts back in December 2005, with the introduction of the VLocity trains to the V/Line fleet. Each set consisted of two carriages seating a total […]

The post A history of nine car long V/Line trains appeared first on Waking up in Geelong.

Post retrieved by 35.215.163.46 using

]]>
I realised the other day I’ve never written a complete piece about the history of V/Line operating nine car long trains – so here goes.

VLocity VL74 leads VL21 and VL57 on a 9-car down Wyndham Vale service at Ravenhall

In the beginning

The story starts back in December 2005, with the introduction of the VLocity trains to the V/Line fleet. Each set consisted of two carriages seating a total of 140 passengers, with a drivers cab at each end. For the peak hour express trains on the Geelong line, they would coupled together three units to make a six car train.

VLocity VL01 leads two classmates on an up Geelong express service at Corio

We then saw a politically motivated 20% cut in V/Line fares in 2007, resulting in an explosion in patronage, especially on the Geelong line.

One response to this was the ordering of additional trains for V/Line, who saw their first three-car long VLocity set enter service in August 2008.

3VL41 heads back to Melbourne at North Shore

But with patronage still growing and suburban and V/Line trains sharing the tracks out of Melbourne, running more services on the Geelong line wasn’t an option. But V/Line had another solution – 7-car long VLocity train, made up of two 2-car sets with a 3-car set.

7 car VLocity consist approaches South Geelong on an up empty cars run from Marshall

These trains were introduced to the Geelong line in November 2008 and ran until June 2015, when Geelong trains commenced using the new Regional Rail Link tracks, and the last of the 2-car VLocity trains had been extended to be three cars along.

VLocity VL16 and classmate depart Tarneit on a down Geelong service

So what next?

As early as 2011 V/Line knew longer trains would be required – their ‘Initial Strategic Operations Plan’, obtained by the Greens under the Freedom of Information Act, says the following:

V/Line anticipates that by this point in time (2018) a high capacity style DMU will be required for Geelong services. It is expected that these trains would operate in 8- or 9-car consists and would each be able to carry 750 – 800 customers. It is expected that the eight peak hour services would be operated with the high capacity DMUs.

And the Regional Rail Link project also included provision for these longer trains – providing 250 metre long platforms at Footscray, Tarneit and Wyndham Vale stations to cater for a hypothetical nine car long train, made up of three 3-car sets.

'VL9' - nine-car VLocity set stopping mark on the RRL platform at Footscray

But for some unknown reason, they decided only only build a 190 metre long platform at Sunshine, despite plenty of space at the city end for a 250 metre long one.

Trio of trains at Sunshine: pair of V/Line services outnumber the single Alstom Comeng

But in 2016 the State Government’s focus switched to a ‘high capacity next generation regional train’ – from the PTV website:

High capacity next generation regional trains

The 2016-17 State Budget includes $10 million in development funding for High-Capacity Next Generation Regional Rolling Stock to cater for the future needs of regional Victoria.

A next generation high capacity regional train will be commissioned in the coming years to cater for strong patronage growth and provide new peak services.

With V/Line saying in 2017 that nine car trains are possible, but won’t be happening any time soon – from the Geelong Advertiser.

Nine-carriage V/Line trains possible, but no plans for Geelong line yet
23 October 2017

The boss of the regional rail network has admitted for the first time nine-carriage trains on the Geelong line are a possibility.

Potential for a mega-train carrying more than 660 passengers comes after calls from commuters and rail experts to reduce peak-time overcrowding on the line.

But while James Pinder said a nine-carriage train was possible, he said it was not a current priority.

Mr Pinder said V/Line’s priority was bolstering its fleet from three to six-carriage trains.

“The (VLocity) train is capable of running in a nine-car configuration. (To run nine-carriage trains) it becomes an issue around infrastructure and number of vehicles (available),” he said.

“We don’t currently have any plans to run nine-car ser­vices. To run large numbers of nine-car services we would have to have a look at (increasing) platform lengths.”

On Monday, a spokeswoman for the Public Transport Minister did not say if the Government was considering introducing nine-carriage trains on the regional network.

The Geelong Advertiser under­stands platforms at Geelong station are long enough for nine-carriage trains — which could open the possibility for Geelong to Melbourne express trains.

Platforms at other smaller stations on the line would need to be extended for a stopping-all-stations Waurn Ponds to Southern Cross train.

Mr Pinder said nine-­carriage trains did not run across the V/Line network at present.

And they finally happen

On Sunday 21 June 2020 V/Line ran their first nine car VLocity train on the mainline, taking it from Southern Cross Station to Wyndham Vale and back to test their operation, as well as platform clearances.

VLocity VL07 leads the 9-car test train through Ravenhall on the down

Sunshine station being the sticking point.

VLocity VL23 pulls up at the very end of Sunshine platform 3

The last one and 1/2 carriages fouling the junction when the front was stopped at the city end of platform 3.

The last one and a 1/2 carriages of the 9-car test train overhang platform 3 at Sunshine

Or sticking out in front after the rear of the train was brought onto the platform.

The train has shunted forward, and now the first one and a 1/2 carriages of the train overhang platform 3 at Sunshine

These tests were then followed in July 2021 by more testing, this time between Ballarat and Lal Lal, which doesn’t see any V/Line passenger services run along it.


ThebusofdoomFSX video

But it took another year for the first nine car train to take passengers – following the 30 May 2022 timetable change.

Passengers in Melbourne’s west now have more space on selected peak services with 9-car VLocity trains running to and from Wyndham Vale Station for the first time.

The longer trains, which have the highest-capacity of any regional commuter train in Victoria, will boost capacity by 50% cent on the busiest part on the V/Line network.

The new 9-car services will run each weekday, with 1 in the morning peak starting at Wyndham Vale and 2 in the evening peak departing from Southern Cross.

As well as improving capacity, the 9-car trains also provide more doors for boarding, reducing crowding in corridors particularly in peak periods.

Platforms will also be extended at Sunshine Station to allow nine-car VLocity trains to stop there in the future.

But due to the short platforms, these nine car services had to run express through Sunshine, as well as Deer Park.

Extending the platforms at Sunshine

With level crossing removal works at Deer Park station regularly closing the Geelong and Ballarat lines, V/Line took the opportunity to finally extend the platforms at Sunshine. In March 2023 the piled foundations were installed.

New piled foundations in place for the up end extension of Sunshine platform 3

The real work kicking off in April, with assembly of the steel platform supports.

Steel platform edge panels waiting to be installed at Sunshine platform 3

And pouring of the concrete deck.

Steel deck in place at Sunshine platform 3 and 4, concrete pour now underway

They then left the completed section of platform fenced off for a month.

Extended platform 4 mostly complete, still fenced off and lacking tactile paving

The nine car trains still having to skip the stop.

VLocity VL23 trails two classmates on an up 9-car VLocity service from Wyndham Vale  express through Sunshine

Until May, when they decided to take down the fence between new and old.

VLocity VL105 arrives into Sunshine on a down South Geelong service

And the introduction of a new timetable from 28 May 2023 adding a stop at Sunshine to the nine car Wyndham Vale services.

However in recent months I haven’t seen a nine car train run – possibly due to a shortage of VLocity railcars following the retirement of the H set locomotive hauled carriage fleet.

Carriage set SSH22 at the up end of the three 6-car sets stored at Echuca

And so they choose to cut down a nine car train to six cars, than a six car train to three.

And now to Melton?

In May 2021 the State Government announced that funding would be provided to allow nine car VLocity trains to run to Melton, a promise repeated in October 2022.

VLocity VL108 and classmate on a down Wendouree service overtake VL60 waiting in the platform at Melton

And reiterated yet again in March 2024.

The Melton level crossing removal works will help introduce larger nine-car VLocity trains as part of the $650 million Melton Line Upgrade, increasing capacity for passengers by 50 per cent and creating 1,000 jobs during construction – while making roads safer and less congested for pedestrians.

To support the introduction of nine car trains, a new train stabling facility is being investigated at Cobblebank where trains could be stored when they are not operating, further supporting local jobs in construction and ongoing maintenance.

But look at what else was happening at the same time – a brand new station at Deer Park was opened in April 2023, with platforms only 215 metres long – half a carriage (10 metres) too short!

VLocity VL90 and classmate arrive into the new elevated Deer Park station on the up

That flew under the radar until August 2024, when the State Opposition gave a media drop to the Herald Sun, and then it was all over the news.

Footnote: it’s not just platform length

The new platform extensions at Sunshine also happen to be ~100mm higher than the existing platforms.

The new platform extensions are ~100mm higher than the existing platforms

This happens to be a new platform height standard, which was also used at Deer Park station – and happens to be incompatible with the outward swinging plug doors fitted to V/Line’s Sprinter railcars.

Freshly refurbished Sprinter 7004 leads 7002 through Deer Park on an up test run from Geelong

And so those trains are banned from stopping at the new platforms.

Post retrieved by 35.215.163.46 using

The post A history of nine car long V/Line trains appeared first on Waking up in Geelong.

]]>
https://wongm.com/2024/09/history-nine-car-vline-trains/feed/ 9 22395
Photos from ten years ago: August 2014 https://wongm.com/2024/08/photos-from-ten-years-ago-august-2014/ https://wongm.com/2024/08/photos-from-ten-years-ago-august-2014/#comments Mon, 26 Aug 2024 21:30:00 +0000 https://wongm.com/?p=22333 Another instalment in my photos from ten years ago series – this time it is August 2014. Regional Rail Link Yes, more Regional Rail Link this month! First off, a V/Line train headed over the newly upgraded North Melbourne flyover bound for Southern Cross, avoiding the suburban trains down below. The sharp curves catching V/Line […]

The post Photos from ten years ago: August 2014 appeared first on Waking up in Geelong.

Post retrieved by 35.215.163.46 using

]]>
Another instalment in my photos from ten years ago series – this time it is August 2014.

Regional Rail Link

Yes, more Regional Rail Link this month! First off, a V/Line train headed over the newly upgraded North Melbourne flyover bound for Southern Cross, avoiding the suburban trains down below.

P14 climbs towards the North Melbourne flyover with a push-pull service bound for Southern Cross

The sharp curves catching V/Line unaware a few years later, when almost the entire VLocity train fleet was withdrawn from service due to wheel wear issues.

At Footscray the upgraded station was open to passengers, with the forecourt to Irving Street nicely landscaped.

Completed forecourt on Irving Street to the west of the station

And restoration work underway on the heritage listed station buildings.

Restoration works underway to the station building on platform 6

There were also works happening in the background – a new traction power substation was under construction, so that extra suburban services could use the track capacity freed up by giving V/Line trains their own route into the city.

New structure being built between the Newport bound tracks for a traction power upgrade

But despite the infrastructure upgrades, little use was made of the extra capacity – by 2018 only half of the extra capacity was being used.

And still on the trains

I photographed a slice of the past out at Beaconsfield, where the 1950s-era overhead wiring and traction power tie station was still in place. It’s all since been replaced by a modern power supply as part of the work to support the rollout of High Capacity Metro Trains to the Pakenham line.

Beaconsfield tie station: traction feeders and equipment hut

At Flagstaff station I found a set of defective myki gates under repair – presumably from being smashed open by a fare evader.

Pair of defective myki gates under repair at Flagstaff station

While over at Southern Cross were Authorised Officers in their new military-style vests, looking out for the next person trying the same trick.

Authorised Officers in their new military-style vests

On the trams

A decade ago City Circle trams were still in the maroon and gold livery, and the ‘shard’ at Federation Square had yet to be demolished for the Metro Tunnel entrance.

W6.981 westbound at Flinders and Swanston Street

The original Z1 class trams were also still running down Swanston Street, with only two doors per side and dinky little sliding windows.

Z1.35 heads north at Swanston and Bourke Streets

East Preston Depot was still open to serve the high floor B2 class trams used on route 11 and 86 – all since replaced by the low floor E class trams based out of ‘New’ Preston Depot.

Track fan leading towards the shed at East Preston Depot

While testing of the new E class trams was still continuing – I found one at the route 57 terminus in West Maribyrnong on a late night test run.

E.6010 departs the route 57 terminus at West Maribyrnong

Meanwhile on Collins Street, things were going backwards – passengers having to step up to trams from street level.

Trams use a temporary stop while platform resurfacing works are completed at Collins and Swanston Street

The platform stops closed so they could be dug up and raised to current standards, despite only being a decade old.

Resurfacing the Town Hall platform stop at the corner of Collins and Swanston Street

Buses

Transdev had taken over from National Bus, but the transition into the new PTV colour scheme was going in fits and starts.

Transdev bus #556 rego 5944AO with the PTV 'shard' livery partially applied

While route 286 through the back streets of Blackburn was removed, but then a few months later, reintroduced as route 271.

Disused bus stops in Blackburn, following the removal of the route 286 bus

Another changed bus stop can be found at Melbourne Airport – the route 901 service to Broadmeadows and eventually Frankston once stopped outside Qantas terminal T1.

Transdev #660 waiting at the route 901 stop at Melbourne Airport

But these days it’s hidden at the far end of the ‘Ground Transport Hub’, a long walk from terminal 4.

And something different

My next stop at Melbourne Airport a decade ago was Brisbane.

IMU165 arrives at Domestic station on the Brisbane Airport rail link

Catching a train from Brisbane Airport into the city.

Waiting for a cross at International station, with a Domestic-bound service arriving in the other platform

To Roma Street – the Brisbane Transit Centre since demolished for the Cross River Rail project.

Looking across the Brisbane Transit Centre above Roma Street station

While I was in town, I photographed some of their first generation EMU trains.

EMU78 passes EMU60 at South Brisbane station

The Merivale Bridge.

6-car SMU set crosses the Merivale Bridge

And buses on the network of Brisbane City Council operated busways.

Brisbane Transport bus C2037 at the Cultural Centre busway station

Which include underground bus stations.

Bus picks up passengers at the underground King George Square busway station

Passengers boarding buses from air conditioned platforms.

Down on the air conditioned platforms at the King George Square busway station

But the reason for my visit was a trip on The Sunlander.

Locomotive 2152 still leading the train at Townsville

A locomotive hauled sleeping train that ran from Brisbane to Cairns until December 2014.

Washbasin and visitors seat inside a roomette carriage

When I woke up the next day, we were well into cane country.

Cane train shunting loaded wagons at Helens Hill

But the trip north is a long one – not arriving into Cairns until that evening.

 Locomotives 2414 and 2152 run around the empty train at Cairns

While in Cairns I rode the Skyrail Rainforest Cableway up to Kuranda, and with some lucky timing spotted a Kuranda-bound train stopped at Barron Falls.

Looking over Barron Falls to the railway on the other side of the gorge

After lunch, it was time to head to Kuranda station, where I found a signal box still in service.

Inside the signal box at Kuranda

And caught the Kuranda Scenic Railway back down the range to Cairns.

Passengers look out over Barron Falls from the station platform

Unfortunately I didn’t have time for the four day journey on the Savannahlander, but I did see it arrive back into Cairns.

This week railcar 2028 made the four day journey from Cairns and Forsayth and back

But it was time to fly home via Sydney – my plane passing over the Hawkesbury River railway bridge on our descent.

Looking down on the Hawkesbury River railway bridge

The Inner West Light Rail

Urbos 2 LRV in the Transport for NSW livery, crossing the Wentworth Park viaduct in Lilyfield

And a Pacific National container train shunting the freight yard at Cooks River.

8173 shunting container wagons at Cooks River yard

Time to change planes, and soon enough I was back in Melbourne – greeted at the airport luggage claim by propaganda for the Napthine Government’s East West Link, CityLink Tulla Widening, and an unfunded Melbourne Airport Rail Link.

Government propaganda at Melbourne Airport spruiking unfunded transport projects

A decade on we’ve gotten the west half of the East West Link, the Tullamarine Freeway has been widening, and airport rail – still talking.

Footnote

Here you can find the rest of my ‘photos from ten years ago‘ series.

Post retrieved by 35.215.163.46 using

The post Photos from ten years ago: August 2014 appeared first on Waking up in Geelong.

]]>
https://wongm.com/2024/08/photos-from-ten-years-ago-august-2014/feed/ 1 22333
Photos from ten years ago: July 2014 https://wongm.com/2024/07/photos-from-ten-years-ago-july-2014/ https://wongm.com/2024/07/photos-from-ten-years-ago-july-2014/#comments Mon, 29 Jul 2024 21:30:00 +0000 https://wongm.com/?p=22269 Another instalment in my photos from ten years ago series – this time it is July 2014. Regional Rail Link The Regional Rail Link project was now approaching the finishing line, with a ‘consolidation train’ running back and forth over the newly laid tracks to bed them down before the commencement of revenue services. The […]

The post Photos from ten years ago: July 2014 appeared first on Waking up in Geelong.

Post retrieved by 35.215.163.46 using

]]>
Another instalment in my photos from ten years ago series – this time it is July 2014.

Regional Rail Link

The Regional Rail Link project was now approaching the finishing line, with a ‘consolidation train’ running back and forth over the newly laid tracks to bed them down before the commencement of revenue services.

The massive flyover at Manor Junction is just visible in the background

The new platforms dedicated to V/Line services at Footscray were also open.

N464 on the down Swan Hill service arrives at Footscray platform 4 on the newly opened RRL tracks

As restoration works continued on the station buildings.

Restoration works underway to the disused signal box on platforms 4 and 5

The new platforms were also ready for 9-car long trains, the first of which didn’t run until 2022.

'VL9' - nine-car VLocity set stopping mark on the RRL platform at Footscray

The new dual gauge tracks across the North Melbourne flyover also opened for trains, but not successfully – the Sydney-bound XPT derailed on the first attempt to leave Melbourne!

Rear view of the derailed train

The cause of the derailment – the new tracks were incompatible with the wheel flange profile used on New South Wales trains.

Derailed bogies of carriages six and seven

And elsewhere on the rail network

The original blue/green and purple VLocity train liveries still dominated the view at Southern Cross Station.

Original liveried VLocity 3VL26 on the left, purple-liveried 3VL51 to the right

Work had started on the 664 Collins Street development atop the south end of Southern Cross Station.

Vehicle access ramp from Collins Street to the 664 Collins Street development atop Southern Cross Station

The escalators at North Melbourne station where entering a steep decline into unreliability.

Escalators still out of order at North Melbourne platform 6

Myki gates at stations were also failing regularly.

Wide gate at Flagstaff station 'Temporarily Unavailable' for morning peak

And Metro Trains – they were using the next train displays at Richmond station to promote the Channel 7 TV show ‘House Rules’.

Metro using the PIDS at Richmond station to promote Channel 7 TV show 'House Rules'

Views that are gone

This view of a V/Line diesel headed over to the South Dynon locomotive depot was an unremarkable sight at the time, but today is hidden beneath the tangle of flyovers for the West Gate Tunnel at Dynon Road.

N451 bound for South Dynon heads along the new broad gauge lead from the North Melbourne flyover

As were these trains at the Wagon Storage Yard at North Melbourne – now taken over by the Wurundjeri Way extension.

B80 stabled on a loaded ballast train in the Wagon Storage Yard at North Melbourne. V/Line railcars VL37 and VL38 alongside

At Footscray station there was only a single small apartment tower to be seen – not the dozens found there today.

EDI Comeng 433M on a down Werribee service arrives into Footscray

And you’d be hard pressed to guess that this scene is now the site of the Metro Tunnel portal at South Yarra – this private garage and car park was cantilevered over the railway cutting on Arthur Street.

Private garage and car park cantilevered over the railway cutting on Arthur Street at South Yarra

And these trees cover Siding Reserve, which has been completely rebuilt to make way for the new railway tracks passing beneath.

EDI Comeng passes Siding Reserve at South Yarra on the up

Trams

A decade ago route 78 passengers were still having to put up with clunky old W class trams trundling down Chapel Street.

SW6.896 on route 78 at the corner of Chapel Street and Dandenong Road

As did route 30 passengers on La Trobe Streets – the old clunkers finally being sent off into retirement in December 2014.

SW6.854 on route 30 heads west at La Trobe and William Streets

Meanwhile on William Street was a sign of the future – a brand new E class trams headed through on test. However it took until December 2021 for these trams to carry passengers on route 58.

E.6009 on a test run, waiting to turn from William Street into Flinders Lane

Buses

The transition from National Bus to Transdev Melbourne started back in August 2013, but buses in the old liveries could still be seen on Hoddle Street.

Queue of four citybound Transdev buses waiting to turn right from Hoddle Street into Victoria Parade

And the Melbourne Visitor Shuttle bus was still kicking around, before it was discontinued in 2017.

Melbourne Visitor Shuttle bus #42 1042AO heads east on Collins Street at Batman's Hill

Some loose ends

The big stadium in Docklands was still called ‘Etihad Stadium’.

A2.286 arrives at final stop of route 24 - Etihad Stadium on La Trobe Street

Beside the Monash Freeway at Church Street in Cremorne, I found this small part under construction, on what was once a freeway off-ramp.

Repurposing the abandoned Church Street loop off ramp as a public park

And a random photo I took of the Geelong skyline – the Kardinia Park light towers in place, but not the massive new grandstands.

Looking across the Geelong skyline from Rippleside

And the view of Saint Mary of the Angels Basilica still dominated the skyline, with the office and apartment towers still to come.

Looking across the Geelong skyline from Rippleside

And an Melbourne Airport Rail note

At Footscray station I found a giant banner linked to the Napthine Government’s ‘Moving Victoria’ campaign, promoting their unfunded ‘Melbourne Rail Link‘ project.

Promoting the unfunded 'Melbourne Rail Link' project at Footscray station, which is intended to include a new railway line to Melbourne Airport

With a promise of trains running every 10 minutes to Melbourne Airport.

More blatant electioneering from the Liberal Party, under the 'Moving Victoria' banner

Conceived as an alternative to the Metro Tunnel, the Melbourne Rail Link tunnel would have run between South Yarra and Southern Cross, serving new stations at Domain and Fishermans Bend – instead of Arden and Parkville, who would be stuck using buses and trams.

'Moving Victoria' poster on Flemington Road in Parkville - spruiking the Melbourne Rail Link project and increased bus and tram services

But as you might have guessed, the Melbourne Rail Link project went nowhere, construction of the Metro Tunnel started a few years later and is almost finished, work on the Melbourne Airport Rail project has been stop-start, and a rail link to Fishermans Bend is as far away as ever.

Footnote

Here you can find the rest of my ‘photos from ten years ago‘ series.

Post retrieved by 35.215.163.46 using

The post Photos from ten years ago: July 2014 appeared first on Waking up in Geelong.

]]>
https://wongm.com/2024/07/photos-from-ten-years-ago-july-2014/feed/ 2 22269
Photos from ten years ago: June 2014 https://wongm.com/2024/06/photos-from-ten-years-ago-june-2014/ https://wongm.com/2024/06/photos-from-ten-years-ago-june-2014/#comments Mon, 24 Jun 2024 21:30:00 +0000 https://wongm.com/?p=22246 Another instalment in my photos from ten years ago series – this time it is June 2014. Regional Rail Link These has been an ongoing theme for many months now, but ten years ago Regional Rail Link was nearing the finishing line – the finishing touches were being applied to the new platforms at Footscray. […]

The post Photos from ten years ago: June 2014 appeared first on Waking up in Geelong.

Post retrieved by 35.215.163.46 using

]]>
Another instalment in my photos from ten years ago series – this time it is June 2014.

Regional Rail Link

These has been an ongoing theme for many months now, but ten years ago Regional Rail Link was nearing the finishing line – the finishing touches were being applied to the new platforms at Footscray.

Applying the finishing touches to the new RRL platforms 3 and 4

And the site offices were being cleared away.

Clearing concrete from the site office area

The road under rail grade separation on the Sunbury line at Anderson Road was open to traffic.

Completed road under rail grade separation on the Sunbury line at Anderson Road

Noise walls were going up beside the existing railway line around Ardeer.

Noise walls under construction near Ardeer station

And the new railway through Wyndham Vale.

Noise barriers taking shape along Clarence Street at Lollypop Creek

Wyndham Vale station looked ready for trains.

Multi-level ramps link the footbridge to platform level

But the street entrance was boarded up – the first train was still a year away.

Street entrance to the station on the western side

V/Line trains still sharing the suburban tracks into North Melbourne station.

P14 leads a push-pull service into North Melbourne station platform 3

But Ballarat trains were snaking across the new tracks to use the new country platforms at Sunshine station.

Citybound VLocity from Ballarat crosses onto the suburban tracks at Sunshine

Flinders Street Station

Metro Trains Melbourne was more interested in making money at Flinders Street Station than running trains.

Metro Trains Melbourne - more interested in making money than running trains

Leasing the site of the long abandoned platform 11 for the construction of a bar.

Long building at the eastern end of the future bar

With views of the Yarra River.

Eastern end of the new bar along platform 11

The station also gained a massive video wall on the concourse, screening an endless loop of advertisements.

Massive video wall at Flinders Street Station showing Foxtel advertisements, among others

They didn’t stop until 25 November 2022, where an activist covered it with paint, shutting it down until June 2023 when a replacement screen was installed.

Southern Cross Station

V/Line’s fleet of A class diesel locomotives were still in frontline service a decade ago.

A70 on arrival at Southern Cross with a service from Bacchus Marsh

While the western end of Southern Cross Station was a much brighter place.

Original liveried VLocity 3VL21 awaits departure time from Southern Cross platform 15

But not for long – work on the 699 Bourke Street development atop the station was underway.

More floors added to the 699 Bourke Street development atop Southern Cross Station

The work supposedly the reason for the failed lighting above the platforms, which has never been fixed.

New signalling

The Kensington Racecourse Essendon Signaling Project (KRESP) was wrapped up on the Craigieburn line.

New signal NKT458 at the up end of Newmarket station among those commissioned as part of the resignalling of the area

The old signalling equipment placed trackside waiting collection.

Now-redundant LED signal heads waiting collection beside the Craigieburn line

The project enabled the retirement of the 1885 signal box at Flemington Racecourse, 1918 signal frame at Kensington, and 1969 signal panel at Essendon.

Trams

The last of the Z1 class trams were still in revenue service, but apprantly not too reliable – this one was being followed by mechanics onboard tram recovery truck ‘R10’.

Recovery truck R10 follows defective tram Z1.86 southbound at Swanston Street and Flinders Lane

And motorists were having trouble figuring out the bike lanes on Swanston Street – like this wanker driving a BMW through the tram stop at A’beckett Street.

Another motorist unable to figure out the bike lanes on Swanston Street - this time at the A'beckett Street end

While at the nearby State Library tram stop was the aftermath of an even less competent driver.

Damaged median fence at the State Library tram stop on Swanston Street

And new liveries

June 2014 was the first V/Line train painted into the new PTV ‘shard’ livery – VLocity railcar 3VL40.

VLocity 3VL40 in the new PTV 'shard' livery

The shiny new colors a contrast to the faded livery the rest of the VLocity fleet was then wearing.

PTV-liveried VLocity 3VL40 coupled to original-liveried classmate 3VL22

The move to PTV colors had also started on Melbourne’s bus fleet, with Westrans moving away from their corporate livery, before their eventual rebranding as part of CDC Melbourne.

Westrans-operated buses at Manor Lakes Central shopping centre

Footnote

Here you can find the rest of my ‘photos from ten years ago‘ series.

Post retrieved by 35.215.163.46 using

The post Photos from ten years ago: June 2014 appeared first on Waking up in Geelong.

]]>
https://wongm.com/2024/06/photos-from-ten-years-ago-june-2014/feed/ 1 22246
Photos from ten years ago: May 2014 https://wongm.com/2024/05/photos-from-ten-years-ago-may-2014/ https://wongm.com/2024/05/photos-from-ten-years-ago-may-2014/#comments Mon, 27 May 2024 21:30:00 +0000 https://wongm.com/?p=22215 Another instalment in my photos from ten years ago series – this time it is May 2014. Regional Rail Link The Regional Rail Link project has been an ongoing theme in this series, and this month we see progress on the rebuidling Footscray platforms 3 and 4 for V/Line trains. With V/Line services still sharing […]

The post Photos from ten years ago: May 2014 appeared first on Waking up in Geelong.

Post retrieved by 35.215.163.46 using

]]>
Another instalment in my photos from ten years ago series – this time it is May 2014.

Regional Rail Link

The Regional Rail Link project has been an ongoing theme in this series, and this month we see progress on the rebuidling Footscray platforms 3 and 4 for V/Line trains.

Applying the finishing touches to the new RRL platforms 3 and 4

With V/Line services still sharing the tracks with suburban trains, such as this since-retired P class hauled push-pull train.

P11 leads a Bacchus Marsh bound push-pull train into the platform at Footscray

And this also retired A class locomotive-hauled train.

A70 arrives into Footscray with an up Bacchus Marsh service

The tracks towards Sunshine were already in place, but still being finished off.

VLocity 3VL26 and classmate pass through Middle Footscray on the up

As was the junction for Bendigo trains at Sunshine.

EDI Comeng on a down Watergardens service passes works on the new RRL tracks on the down side of Sunshine station

The trees found at what was once David Matthews Park were still in place, but they’ve since been cut down – the land sold off for townhouses.

A few trees are all that remain of David Matthews Park

Southern Cross Station

At the entrance to the station the Water Tower Clock was ready to be unveiled.

Stage rigging company setting up a big red curtain over the recently installed Water Tower Clock

A big red curtain erected over the top.

Stage, seats and lighting all set up ready for the unveiling of the Water Tower Clock

Ready for the unveiling held on 14 May 2014.

Seats in place at Southern Cross Station for today's official unveiling of the restored Water Tower Clock

Meanwhile at the other end of the station, work was still underway on the 699 Bourke Street development.

More floors added to the 699 Bourke Street development atop Southern Cross Station

While trains continued to use platforms 13 through 16 down below.

EDI Comeng arrives into platform 14 at Southern Cross, with a V/Line service in platform 15

Note the lights on the ceiling were still operational – they failed a few months later and have never been fixed.

Myki receipts

Remember when unwanted Myki receipts used to cover railway stations and tram stops all over Melbourne?

Still more discarded Myki receipts, this time down at Docklands

That problem wasn’t fixed until June 2019!

The crumbling station building at Newmarket

In 2013 I noticed that the foundations of the station building at Newmarket was falling apart, with Metro deciding to demolish the station.

Work being carried out to the soon to be demolished citybound station building at Newmarket

But after a public outcry they backpedaled, adding a web of steelwork beneath the building, and replacing the cantilevered verandah with a freestanding steel structure, which is still in place today.

Ding ding on the trams

Remember the Colonial Tramcar Restaurant?

SW6.964 waits to turn from Spencer Street into Bourke

It last ran in October 2018.

I also found a faded ‘Bumblebee’ tram headed down Bourke Street.

Faded 'Bumblebee 2' stickers on C2.5113

They’re still used on route 96 today, but have since received a refreshed PTV livery.

Over on Collins Street, the recently installed plastic kerbs along the tracks didn’t do much to stop taxi drivers making u-turns in front of trams and getting t-boned.

Plastic kerbs along the Collins Street tram stops don't do much to deter taxi drivers from making u-turns

A problem not solved until 2022, when much higher concrete barriers were installed.

Rickety old W class trams were also still being used on route 30 across the top of the CBD.

W6.971 shunts into the Brunswick Street siding before the next route 30 run

They were finally demoted to the City Circle from December 2014, and replaced by modern E class trams in November 2020.

Meanwhile at Footscray, things look the same as today.

Z3.135 arrives into the route 82 terminus at Footscray

The high-floor Z3 class trams having received a stop-gap refurbishment in 2021 so they can stay in service until the arrival of the ‘Next Generation’ G class trams.

And outside Yarra Trams head office on William Street, the RTBU Tram and Bus Division was holding a rally in the lead up to their 2015 Enterprise Bargaining Agreement.

RTBU Tram and Bus Division protest outside the Yarra Trams head office at the corner of William and Bourke Streets

Tram and Bus Division secretary Phil Altieri addresses the rally.

RTBU Tram and Bus Division secretary Phil Altieri addresses the rally outside the Yarra Trams head office

Along with Labor MP and then-Shadow Minister for Road Safety Luke Donnellan.

'Shadow Minister for Road Safety and the TAC' Luke Donnellan addresses the RTBU rally outside the Yarra Trams office

A bus

Around Footscray the Westrans brand was still in use.

Westrans #77 rego 6159AO on route 406 at Footscray station

One of a number of bus operators owned by Kefford Corporation , in October 2014 it was rebranded as CDC Melbourne, and the buses progressively repainted into PTV livery.

To spend a penny

I was at Parliament Station and photographed the public toilets located beneath Gordon Reserve.

Underground public toilet at the Gordon Reserve opposite Parliament Station

Opened c1924, they’re still in use today, unlike many other underground toilets in Melbourne.

And around the corner at Nicholson and Albert Street I snapped a cast iron public urinal.

Cast iron public urinal at Nicholson and Albert Street

One of eight surviving urinals around Melbourne which are heritage listed.

And the rest

The former MMBW House at 120 Spencer Street was a 25 story dull grey office tower completed in 1979 as the head office of the Melbourne and Metropolitan Board of Works, which got an early-2000s facelift with the addition of a bright red band across the top.

Building maintenance unit ready to be deployed by the painting crew on the eastern facade

But in 2014 it scored a millennial greige makeover.

Painters at work on the northern facade

The anodised aluminum cladding being painted over in a dull generic grey.

Few spots on the northern facade still to be painted

And since then it’s gone even more millennial – site of a WeWork coworking space.

Footnote

Here you can find the rest of my ‘photos from ten years ago‘ series.

Post retrieved by 35.215.163.46 using

The post Photos from ten years ago: May 2014 appeared first on Waking up in Geelong.

]]>
https://wongm.com/2024/05/photos-from-ten-years-ago-may-2014/feed/ 6 22215
Photos from ten years ago: April 2014 https://wongm.com/2024/04/photos-from-ten-years-ago-april-2014/ https://wongm.com/2024/04/photos-from-ten-years-ago-april-2014/#respond Mon, 29 Apr 2024 20:30:00 +0000 https://wongm.com/?p=22007 Another instalment in my photos from ten years ago series – this time it is April 2014. Regional Rail Link As with previous months, I was following progress on the Regional Rail Link project which was constructing new tracks from Southern Cross through to Wyndham Vale. At Footscray station the new V/Line platforms were taking […]

The post Photos from ten years ago: April 2014 appeared first on Waking up in Geelong.

Post retrieved by 35.215.163.46 using

]]>
Another instalment in my photos from ten years ago series – this time it is April 2014.

Regional Rail Link

As with previous months, I was following progress on the Regional Rail Link project which was constructing new tracks from Southern Cross through to Wyndham Vale.

At Footscray station the new V/Line platforms were taking shape.

North end of platform 4 for down RRL trains

As well as the new tracks through Middle Footscray, passing through compulsorily acquired houses and a piece of parkland.

A few trees are all that remain of David Matthews Park

At Sunshine the junction between the Ballarat/Geelong and Bendigo lines wasn’t quite finished.

Future junction for the Ballarat/Geelong and Bendigo lines in place at the down end

And at Anderson Road on the Sunbury line the level crossing was still in place.

Citybound Comeng crosses the Anderson Road level crossing in Sunshine

Excavation underway to take the road beneath the new bridge spans.

Work still to go to bring the road beneath the new bridge spans

At Deer Park the junction for the new route through Tarneit and Wyndham Vale to Geelong was in place.

RRL tracks towards Tarneit now in place at the junction

But the track beyond was still to be laid.

RRL tracks head north towards the city at Dohertys Road

However the car park and station buildings were complete at Tarneit.

Car park and station buildings all complete at Tarneit

And track laying was underway from the Geelong end.

Ballast tampers and regulators on the track at Leakes Road

Farewell to the Hitachi trains

Steamrail Victoria ran a farewell tour for the ‘Hitachi’ trains in April 2014.

Last chance for a photo as the Hitachi departs Craigieburn

Heading around the City Loop a few times, with the windows down of course!

Looking out into the dark of the City Loop tunnels

And to newer parts of the suburban network, such as South Morang.

'Coldstream' on the destination roll of 288M during the South Morang stop

More trains

Steamrail Victoria also took their then-125 year old steam locomotive Y112 out for the trip around the suburbs.

Y112 leads the train back through Seaholme station

While V/Line was still using diesel locomotives and carriages from the 1950s in frontline service.

P18 trails a push-pull set shunting over to South Dynon for the day

Out at Craigieburn I photographed the oddball ‘flipdot’ LED next train displays.

Flipdot LED next train displays at Craigieburn platform 2

And atop Southern Cross Station work was underway on the 699 Bourke Street development.

Work on the Bourke Street end of the 699 Bourke Street development

While down below, the lighting for platforms 13 and 14 still worked – it failed in early 2015 and is still yet to be repaired.

Comeng 329M departs Southern Cross on a down Laverton service

Ding ding on the trams

A decade ago the maroon liveried City Circle trams were still looking around the CBD – they’ve since been upgraded to ‘W8’ standard.

W6.983 westbound on the La Trobe Street bridge

Route 86 was stuck with the rickety D2 class ‘Combino’ low floor trams.

D2.5009 eastbound on the La Trobe Street bridge

And on Swanston Street the 1970s-era ‘Z1’ class with no air conditioning and useless windows were still in service.

Z1.96 heads south at Swanston and Bourke Streets

April 2014 also saw a number of tram stops on La Trobe Street closed to passengers, as they were too short for the new ‘E’ class trams to stop at them.

Stop 7 on La Trobe Street at Russell Street closed to passengers

But upgrades were underway as well – such as a complete rebuild of the tram junction at Victoria and Nicholson Street in Carlton.

Looking north over the Victoria and Nicholson Street worksite

Clueless drivers

What’s worse than one idiot driving through the Bourke Street Mall? A gang of idiots following them.

Their comrades in idiocy also head through the Bourke Street Mall

At least this nuffy got pulled over by the cops.

Police talk to a nuffy driver in the middle of the Bourke Street Mall

And government propaganda

The State Government’s “Moving Victoria” propaganda campaign was in full swing ready for the 2014 State Election, promoting ‘Major road upgrades’.

Rear taxi advertising from 'Ultimate Media'

‘New trains, trams and buses’.

Advertising on the back of Melbourne taxis

And ‘East West Link‘.

Rear and rooftop taxi advertising from 'Ultimate Media'

The latter project being cancelled after the election, only to float back up like a turd every four years.

Footnote

Here you can find the rest of my ‘photos from ten years ago‘ series.

Post retrieved by 35.215.163.46 using

The post Photos from ten years ago: April 2014 appeared first on Waking up in Geelong.

]]>
https://wongm.com/2024/04/photos-from-ten-years-ago-april-2014/feed/ 0 22007