Trains Archives - Waking up in Geelong https://wongm.com/category/trains/ Marcus Wong. Gunzel. Engineering geek. History nerd. Tue, 31 Dec 2024 00:29:56 +0000 en-AU hourly 1 https://wordpress.org/?v=6.7.1 23299142 Photos from ten years ago: December 2014 https://wongm.com/2024/12/photos-from-ten-years-ago-december-2014/ https://wongm.com/2024/12/photos-from-ten-years-ago-december-2014/#comments Mon, 30 Dec 2024 20:33:00 +0000 https://wongm.com/?p=22739 D2.5014 stops for passengers at Batman Park on a southbound route 96 service

The post Photos from ten years ago: December 2014 appeared first on Waking up in Geelong.

Post retrieved by 92.247.181.17 using Inoreader/1.0 (+http://www.inoreader.com/feed-fetcher; 1 subscribers; )

]]>
It’s the last day of the year so what better time than another instalment in my photos from ten years ago series – this time it is December 2014.

On the train

Yes, still on the Regional Rail Link topic – Ballarat and Bendigo trains now had their own tracks through Footscray to Sunshine, along with their own next train displays located away from the ones showing suburban trains.

 V/Line only PIDS added to the concourse at Footscray station

But for now Geelong line services were still running along the Werribee line. Here we see a N class locomotive hauled train passing through Williams Landing.

N462 leads a down Geelong service through Williams Landing

A VLocity train passing through Laverton station.

VLocity 3VL50 leads a down Geelong service past an up Siemens train at Laverton station

And another passing through the platforms at South Kensington.

VLocity 3VL40 leads an up Geelong service along the suburban tracks at South Kensington

Which then took the crossover at the city end of the station to access the new V/Line tracks towards Southern Cross.

Up Geelong service on the suburban lines at South Kensington crosses onto the RRL tracks towards Southern Cross

Freight trains

A decade ago Pacific National still had the contract to transport grain by rail to the flour mill at Kensington. Southern Shorthaul Railroad won the contract in November 2017.

XR551 and X41 bring the loaded Kensington grain service into the goods siding at Melbourne Yard

Meanwhile down at North Geelong Yard Pacific National was busy scrapping surplus wagons – the bulk of which once transport freight that has been lost to road.

Scrapping of surplus Pacific National wagons at North Geelong Yard

Down around Geelong

The North Geelong B signal box was still hanging around a decade after it had been decommissioned in 2005, and surprisingly it hung around almost a decade longer – eventually being demolished in May 2022.

A decade of decay since decommissioning

While down in Grovedale money was getting spent on Baanip Boulevard, with a new bridge being built over the railway to link the Geelong Ring Road to the Surf Coast Highway.

Bridge piers in place for Baanip Boulevard crossing over the railway

And down at North Shore even the dive of a station was getting some attention – new asphalt!

Platforms 1 and 2 freshly resurfaced

Ding ding on the trams

Remember the ‘Melbourne Star’ observation wheel? This tram was advertising it, before the operator went broke in 2021.

B2.2100 advertising 'Melbourne Star' has now caught up on the timetable, and is ready to depart Camberwell Junction with a route 75 service towards the city

But a tourist icon that people actually patronised was the Colonial Tramcar Restaurant – it ran until 2018 when their restaurant trams were kicked off the Yarra Trams network due to safety concerns.

SW6.935 and SW6.964 lead the lunch run at the corner of Spencer and Collins Street

Another safety concern that is having to dodge cars to climb onboard tram at South Yarra station. The platform stop there wasn’t opened until 2021.

D1.3518 picks up outbound route 8 passengers at South Yarra station

Another crappy tram stop was the one at La Trobe and Swanston Street – on this December afternoon it was overwhelmed by a crowd of RMIT graduates spilling out onto the road. Platform stops were not provided along La Trobe Street until July 2024.

SW6.881 arrives to hoards of RMIT graduates at the corner of La Trobe and Swanston Street

And continuing on that theme, now we’re at Collins and Queen Street – closed in 2015 following completion of a new platform stop at Collins and William Street.

C.3003 heads west on route 109 at Collins and Queen Street

Another stop to close being the one for southbound route 96 passengers at the corner of Spencer and Flinders Street.

'Stop closing' notice for southbound route 96 passengers at the corner of Spencer and Flinders Street

Works about to start on new platform stops at Batman Park a short distance to the south.

D2.5014 stops for passengers at Batman Park on a southbound route 96 service

A few buses

A decade ago route 400 between Sunshine and Laverton was operated by plain white liveried buses – an artifact of the shared operation of the route between Westrans and Sita. Today the operations are now CDC Melbourne and Transit Systems, and the white buses are gone – they’re mostly PTV orange, with the exception of a few buses still in the old poo brown Sita corporate livery.

Plain white liveried Sita bus #130 rego BS00BO waits for route 400 passengers at Sunshine station

Another oddball bus was the British-built Optare Solos used on the SkyBus hotel shuttle service around the Melbourne CBD. Later branded as ‘SkyBus Link’, the service was discontinued in 2020 thanks to the Covid-19 pandemic, and never restored.

SkyBus hotel shuttle #36 rego 7109AO - this weird looking thing is a British-built Optare Solo

And the last bus is a Designline ‘bubble’ bus running on route 903 along Bell Street in Coburg.

Transdev bus #637 rego 7260AO heads west on a route 903 service along Bell Street in Coburg

Stuck in traffic waiting at the level crossing with the Upfield line – which was removed in June 2020.

Shattered bits of orange, red and clear plastic mark multiple crashes at the Bell Street level crossing in Coburg

Ticketing bits

Down in Geelong it was once possible to buy a ‘Short Term Ticket‘ from bus drivers rather than use a Myki card – an option removed in April 2013.

'myki is the only way to travel' sticker on the side of a McHarry's bus

While in the lead up to the November 2014 election both parties promised to cap Melbourne suburban travel to zone 1 prices, and introduce the ‘Free Tram Zone’ in the CBD.

PTV flyers onboard a tram promoting the 'Free Tram Zone'

Both starting from 1 January 2015.

'Free Tram Zone from 1 January 2015' and 'This stop is outside the Free Tram Zone' notice outside Parliament Station

But don’t think they’re giving you something for nothing – PTV was simultaneously running yet another fare evasion campaign.

Transdev / PTV branded fare evasion advertisement on the rear of a bus

As well as promoting free travel on Christmas Day.

PTV advertisement for free travel on Christmas Day at Melbourne Central station

Car parking

What’s a worse use of prime CBD land than a ground level car park? This is the ‘Golden Square’ car park at 217 Lonsdale Street, which is still a car park today.

'Golden Square' car park at 217 Lonsdale Street

And this is the ‘Safe City Car Park’ at 132 Little Bourke Street in Chinatown – which has since been turned into a pop up event space.

'Safe City Car Park' at 132 Little Bourke Street

And finally – a power station

Here we are at the main gate to Anglesea Power Station.

Main gate to the Anglesea Power Station

Located in the middle of the Anglesea Heathlands.

Looking down on the Anglesea Power Station from the lookout atop the adjacent coal mine

Next to a brown coal mine.

Dump truck returns for yet another load of overburden out of the open cut coal mine at the Anglesea Power Station

Opened back in 1969 to power Alcoa’s Point Henry smelter outside of Geelong, the smelter was closed down in July 2014 but the power station remained open pending a new owner, before it too was shut down in August 2015.

Footnote

Here you can find the rest of my ‘photos from ten years ago‘ series.

Post retrieved by 92.247.181.17 using Inoreader/1.0 (+http://www.inoreader.com/feed-fetcher; 1 subscribers; )

The post Photos from ten years ago: December 2014 appeared first on Waking up in Geelong.

]]>
https://wongm.com/2024/12/photos-from-ten-years-ago-december-2014/feed/ 6 22739
Cooked next train displays at Southern Cross Station https://wongm.com/2024/12/cooked-next-train-displays-at-southern-cross-station/ https://wongm.com/2024/12/cooked-next-train-displays-at-southern-cross-station/#comments Mon, 23 Dec 2024 20:30:00 +0000 https://wongm.com/?p=22722 It’s a hot summer day and you just want to get home, so you walk into Southern Cross Station to catch a train – only to be greeted by a failing wall of next train displays. Yep, it’s cooked Three out of the seven displays are barely visible – leaving the next seven V/Line departures […]

The post Cooked next train displays at Southern Cross Station appeared first on Waking up in Geelong.

Post retrieved by 92.247.181.17 using Inoreader/1.0 (+http://www.inoreader.com/feed-fetcher; 1 subscribers; )

]]>
It’s a hot summer day and you just want to get home, so you walk into Southern Cross Station to catch a train – only to be greeted by a failing wall of next train displays.

'Gladiator II' advertising covers Southern Cross Station

Yep, it’s cooked

Three out of the seven displays are barely visible – leaving the next seven V/Line departures MIA, along with the entire list of V/Line arrivals, and all services on the Cranbourne, Pakenham and Frankston lines.

Three out of seven next train displays out of service due to overheating at Southern Cross Station

But luckily you turn around and find a second set of screens – only to discover half these ones are also broken – you can now see the Cranbourne, Pakenham and Frankston lines; and the V/Line arrivals are nice and bright; but the Lilydale, Belgrave and Glen Waverley line are gone.

Three out of seven next train displays out of service due to overheating at Southern Cross Station

And the next seven V/Line departures – if you squint hard, you might just be able to read them on the faded screen.

Three out of seven next train displays out of service due to overheating at Southern Cross Station

And don’t hope on walking over to the platforms either – the screen at the top of platform 11 and 12 was also hardly visible.

Train display at Southern Cross Station platform 11 and 12 hardly visible thanks to the screen overheating

As was the one above platform 15 and 16.

Train display at Southern Cross Station platform 15 and 16 hardly visible thanks to the screen overheating

But why?

The reason for the screens not working? The screens aren’t broken outright, as they work most of the time.

Half of the suburban next train displays have come back, but the other half are still dead at the main entrance to Southern Cross Station

The clue being in tiny text in the corner of the screen – ‘TEMPERATURE WARNING!!’. I photographed the failing screens on December 5th, when the top temperature was 33.2 °C, and that was enough for the the screens to be unable to cope.

'TEMPERATURE WARNING!!' message on the PIDS at Southern Cross Station

I found a similar warning on one of the platform screens on February 4th – when the top temperature was 37.5 °C.

'TEMPERATURE WARNING!!' message on the PIDS at Southern Cross Station

So in theory a simple fix – but the management at Southern Cross Station can’t even change a light bulb.

And they aren’t that old

You might point the finger at the screens being old, but that isn’t exactly true – for years Southern Cross Station used a ‘temporary’ array of CRT television screens to display the next suburban train departures.

Next train display at Southern Cross with 'Keilor Plains' as the terminus of the Sydenham line

The permanent LCD screens not being switched on for suburban trains until March 2009.

Suburban train displays finally working after three years

Allowing the ‘temporary’ screens to be covered up.

'Temporary' suburban CRT next train displays finally covered up, over 3 years since the supposed 'completion' of the station. How long until they actually go?

Until they were finally removed in April 2010.

Finally removing the 'temporary' CRT next train displays, after how many years?

And the LCD screens didn’t last long anyway – they were removed in November 2012 for “maintenance”.

LED screens outside the Bourke Street entrance to Southern Cross Station out of service for maintenance

Out of service from November 12 to December 23 – that’s 41 days to change eight screens!

Out of service from November 12 to December 23 - that's 41 bloody days to change eight screens!

Footnote: another other things cooking in the heat

Melbourne’s Comeng suburban trains from the 1980s also once had a reputation for failing in the heat.

Alstom Comeng 640M arrives at Camberwell on the up

The air conditioning failing once the temperature reached 35 degrees.

Air conditioning unit on a Comeng - note the cutout for the guards periscope

So after a spate of failures during the summer of 2008-09, the decision was made to upgrade the air conditioning units fitted to said trains.

Different style ground plane antenna on the roof of Comeng 301M

And lo and behold – they’re just as reliable as newer trains in hot weather.

Post retrieved by 92.247.181.17 using Inoreader/1.0 (+http://www.inoreader.com/feed-fetcher; 1 subscribers; )

The post Cooked next train displays at Southern Cross Station appeared first on Waking up in Geelong.

]]>
https://wongm.com/2024/12/cooked-next-train-displays-at-southern-cross-station/feed/ 6 22722
The saga of lifts at Watergardens station https://wongm.com/2024/12/watergardens-station-lift-upgrades/ https://wongm.com/2024/12/watergardens-station-lift-upgrades/#comments Mon, 02 Dec 2024 20:30:00 +0000 https://wongm.com/?p=20153 For something that was built from scratch 20 years ago, the accessibility issues at Watergardens railway station on the Sunbury line stand out – this is the story of the lifts that didn’t work, and the effort that went into fixing them. In the beginning For years Sydenham station was a wayside stop on the […]

The post The saga of lifts at Watergardens station appeared first on Waking up in Geelong.

Post retrieved by 92.247.181.17 using Inoreader/1.0 (+http://www.inoreader.com/feed-fetcher; 1 subscribers; )

]]>
For something that was built from scratch 20 years ago, the accessibility issues at Watergardens railway station on the Sunbury line stand out – this is the story of the lifts that didn’t work, and the effort that went into fixing them.

Big crowd waiting for a citybound train at Watergardens station

In the beginning

For years Sydenham station was a wayside stop on the empty plains north-west of Melbourne enroute to Bendigo.


SLV photo H1077

But the suburbs of Melbourne eventually grew north to Sydenham, and so in 2000 the decision was made to extend suburban trains from St Albans five kilometres north to a new station called ‘Watergardens’.


Weston Langford photo

Which opened in 2002.

Plaque marking the opening of Watergardens station and the electrified Sydenham line

The new terminus was well provisioned for a terminus station – three platforms, with centre turnback for terminating trains.

Centre island platform at Watergardens station

Sidings at the down end for stabling trains to form peak services.

Siemens train shunts out to the yard at Watergardens

Three lifts – one of the street on both sides, and a third to the central island platform.

Eastern entrance to Watergardens station

With stairs in parallel.

Steps between platform and concourse at Watergardens station

However the footbridge across the tracks is narrow compared to what stations have today.

Footbridge across the tracks at Watergardens station

And the lifts were undersized compared to current standards – of 12 person capacity rather than 18.

But the lifts don’t work

As Watergardens station aged, the lifts weren’t exactly the most reliable – from 2016:

A malfunctioning lift at Watergardens train station that reportedly breaks down nearly every second week, on average, is likely to be replaced.

Western Metropolitan MLC Bernie Finn told state parliament recently the Watergardens lift had broken down 43 times over the past two years, and sometimes took a week to fix.

“For people to have to wait for up to a week for a broken down lift to be fixed seems to me to be quite insane. That is just ridiculous,” he said. “It is a major concern, particularly for people with disabilities and for elderly people.”

Public Transport Victoria and Metro Trains have been forced to provide maxi taxis for special needs commuters, who could not access the train to get to doctors’ appointments.

Mr Finn has also called for a second ramp to be built to service both sides of the station.

“I find it just astonishing that we have a lift there that has broken down so often. There is only one ramp for people to use, and it is on the opposite side of the platform,” he said.

“I just do not understand how the PTV could allow such a situation to exist.”

A PTV spokesman said it would continue to provide “alternative transport arrangements” for passengers when lifts are out of order.

“PTV is committed to finding a permanent solution for passengers – which at this stage could involve replacing the lifts,” he said.

Lift failures rendering stations inaccessible being the reason why the trio of stairs, lifts and long zig-zagging ramps with a DDA compliant 1 in 14 gradient has became the standard at new and upgraded railway stations in Melbourne from 2013.

Looking up the long ramp back to the concourse

But in the case of Watergardens station it was too late for that, so the only option was to upgrade the control and power supply systems for the existing lifts to improve their reliability – requiring one outage from 1 to 5 May 2017, and a second from 18 September to 3 November 2017.

And spending the big money

But even upgraded lifts can still fail, so in 2016 PTV commissioned Jacobs Group to study possible options to bring Watergardens station up to current standards, and provide a redundant method of access if the existing single lift to a platform failed.

They looked at going under, over and through the tracks. As you might expect, building a new level crossing got knocked on the head pretty quickly, and going under option was less than salubrious, so also got knocked out.

This left three options to upgrade the existing overpass – duplicating the three existing lifts, providing a ramp beside each lift, or a hybrid option with a additional lift to the island platform and two ramps to the street entrances.

Fitting in the new ramps on the street site was easy.


Artist’s impression, Jacobs 2016

But the island platform was more constrained, with a DDA compliant ramp taking up much the space at the Melbourne end.


Artist’s impression, Jacobs 2016

The Jacobs report also looked at the costs of the three options:

3.2 Constructability and Whole of Life Costings
An estimate of the turn out and life cycle cost for the 3 options – out to 30 years – is attached as Appendix D.
In precis, the full lifts option is the cheapest in the short term, the full ramps the most expensive:
Option 1 – All Lifts $5,276,700.00 – immediate Capital Construction Cost.
Option 2 – 2 ramps + 1 lift $5,595,000.00 – immediate Capital Construction Cost.
Option 3 – All ramps $6,568,200.00 – immediate Capital Construction Cost.

When factoring in the costs to service and maintain each option for 30 years (non-discounted cashflow) the costs become:

Option 1 – All Lifts $9,868,230.00 – adding $4,591,530.00 (non-discounted $s) in costs over 30 yrs.
Option 2 – 2 ramps + 1 lift $7,661,793.00 – adding $2,066,793.00 (non-discounted $s) in costs over 30 yrs.
Option 3 – All ramps $7,632,994.00 – adding $1,064,794.00 (non-discounted $s) in costs over 30 yrs.

For the first 10 years Option 1 has the lowest WOL cost.
Between year 10 to year 29 Option 2 has the lowest WOL cost.
After 30 years Option 3 has the lowest WOL cost.

Surprisingly the lift option was cheaper to build initially, through obviously the ramps became cheaper once ongoing maintenance costs were included.

Decision time

The 2018-19 State Budget committed $8.9 million to upgrade Watergardens station, with community consultation taking place in July 2018.

'We're building new lifts at Watergardens station' poster on the concourse

But there was a problem – the preferred option was installing additional lifts, but the PTV Network Technical Standards at the time required lift, stairs and a ramp for a vertical change of 5.6 metres – and so a waiver was required to provided a second lift, as well as to infringe on the minimum platform width where the new lift would land on the island platform.

However a waiver was granted, and work started on the project in early 2021.

The new lifts being located in plain grey towers, beside the existing brick ones.

Three new lifts in place at Watergardens station, providing redundant access to all areas

An additional lift added at the end of the western entry.

Second lift added at the western entry to Watergardens station

And to the eastern entry.

Second lift added at the eastern entry to Watergardens station

While the additional lift to the island platform was snuck in beneath the existing concourse.

Siemens 807M arrives into Watergardens on the up

The stairs to the platform rebuilt.

New stairs to Watergardens platform 2 and 3, relocated to make way for the second lift

To pass around the new lift shaft.

Second lift added at Watergardens platform 2 and 3

Which looks like it was always there.

Contactless lift at Watergardens platform 2 and 3

PTV having this to say about the upgrade.

We have opened three new lifts at Watergardens Station to help people move around the station precinct and catch the train more easily.

This is part of the Public Transport Accessibility Improvements Program, which sees several metropolitan train stations upgraded to comply with current access guidelines for people with disabilities.

The new lifts feature:

  • more space to increase lift capacity and allow for social distancing
  • improved lighting
  • a back up power supply, making them more reliable and avoiding breakdowns
  • improved security with new CCTV coverage and windows
  • more open design than the existing lifts with partially transparent lift walls.

Other completed works at Watergardens Station:

  • We have increased the number of wheelchair accessible parking spaces in the Sydenham Road car park from five to nine.
  • A back up power generator has been constructed to help power the lifts and station in the event of a blackout.
  • Six extra CCTV cameras have been installed to cover blind spots around the stairs.
  • Toilet refurbishments have been completed on the central platform and concourse to improve passenger amenities.
  • New tactile ground surface indicators have been installed on all three platforms to improve accessibility.

A lot of work for a railway station only 20 years old!

Footnote: ramps vs lifts

Back in 2016 the Level Crossing Removal Authority also had to fight to avoid building massive ramps as part of the Mernda rail extension, but since then it seems to be a non-event – most new stations built since then feature dual redundant lifts to each platform, rather than ramp and a lift.

Pair of operational lifts at Pakenham platform 1

Footnote: platform extensions

The 2016 Options Report by Jacobs touched on the need for platform extensions at Watergardens station for the upcoming fleet of High Capacity Metro Trains, and flagged at changes at the city end would be the logical option.

1.5 Provision for other works – Future 10-car HCMT

Possible options should consider other works that may occur at or around the station in the future. The most important of these – in fact, the only one known to Jacobs – is the platform extensions for the new 10-car High capacity Metro trains (HCMT).

Currently the 3 platforms are 160 m long. The island platform is approximately.8.9 m wide at the down end; tapering on the Platform 3 side to c.7 m at the up end. All platforms will require an extension of 70m to bring them 230 m and, depending upon where this extension occurs, Platform 3 may need straightening.

Informal advice from PTV indicates that it is likely that it would be simpler and less costly to extend the platforms toward the city.

Jacobs’ own study of aerial photographs indicates that the gates to the stabling yards down from the station are c. 200 m from the NW end of the platform and that there are at least 7 sets of points in this area. The corridor to the SE is significantly less congested with 5 sets of points within c.250 m of the station after which it appears to be completely unencumbered until it reaches the next station at Keilor Plains.

For these reasons it seems most likely that the platform extensions would occur to the SE (up end); widening Platform 3 to remove the existing taper to provide an island of consistent width for its full length. Although the platform extension has no immediate bearing on the provision of secondary (or contingency) means of access to and from the station, as the widening would create additional space on the platform that would ease a pinch point in one of the options (see below), an up end extension to the platforms has been presumed in the development of the options..

And then look at what happened in 2022 – the entire lead into the yard at the down end of Watergardens was rebuilt.

Platform extensions at the down end of Watergardens station awaiting a concrete pour

Platform 1 extended by 15 for a 7-car HCMT.

Platform extension at the down end of Watergardens platform 1

And platform 2 and 3 extended by an even shorter 12 metres.

Platform extension at the down end of Watergardens platform 2 and 3

They also completed a major track slew at the down end of the yard at Watergardens, taking the sidings from 329 metres (two 6-car trains) long to 560 metres (three 7-car trains) long.

Siemens 839M and 765M stabled at the down end of Watergardens siding A

Footnote: the gory technical details

First – the options study by Jacobs.

Watergardens Accessibility Study
Options Study
December 2016

Watergardens station was designed and constructed between c. 2000 – 2002. The station was officially opened in January 2002.

The design provided for a single lift and stair access only to and from the island platform and the adjacent streets on either side of the station. However, the lifts have proved to be unreliable and, for those unable to use the stairs, access and egress to and from or across the station from either side has been made difficult.

With this in mind, PTV commissioned Jacobs to carry out an Options Study to draw out such options as might exist to provide a secondary means of access from one side of the station to the other and to the station’s central island platform for those unable to use a flight of stairs

The station contains 3 platforms – Platform 1 to the NE on the shopping centre side of the line and platforms 2 and 3 forming an island platform. Access to Platform 1 is made by one of two sets of stairs – one of 12, the other 13 risers – or one of two ramps – rising from the kerbside footpath. From the level of Platform 1 access is provided to the concourse level (c. 5600 mm above Platform level) by means of a lift or stair of 33 risers (two flights – of 17 and 16 risers).

From the SW side of the line, access to the station is made at concourse level. This is some 7000 mm above the pavement level, with access provided by means of lift or stairs. This stair consists of two flights – of 20 and 21 risers – 41 risers in all.

From the concourse access is provided to the island platform by lift and stair of two flights.

Looking at going under, over and through the tracks.

2. Options
Based upon the limitations noted above, there are three basic approaches – to cross the rail line / gain access to the platforms:
– At grade
– Under the permanent way
– Over the permanent way

As you might expect, building a new level crossing got knocked on the head pretty quickly.

2.1 Options – At-grade

Whilst recognising that both pedestrian and vehicular at-grade crossings both are, as a matter of PTV guidelines, no longer considered suitable, for completeness the possibility of at-grade options has been considered.

An at-grade point of egress has been provided at the down (NE) end of the island platform. This was previously used to provide emergency egress for the mobility impaired from the platform to the kerb-side on Sydenham Road, but the practice has since been discontinued. Presently, in the event of a lift failure, mobility impaired patrons are re-entrained and taken to the nearest accessible station from whence they are returned to Watergardens by taxi.

The ramp is still used by the Train drivers to access the stabling yard down line from the station.

In discussion with PTV and MTM at an initial Stakeholder consultation, it was agreed, for the above reasons and more, that an at-grade option is not feasible and was not pursued as a viable design option.

The going under option was less than salubrious, so also got knocked out.

2.2 Options – Under the permanent way

One underpass option was considered.

This is based upon using ramps of a maximum length of 6000 mm at an inclination of not more than 1:14 (one metre rise over 14 metres of length). Landings of not less than 1200 mm length are provided between each section of ramp. Larger landings are provided at changes in direction.

The scheme provides a straight ramp (of 10 x 6000 mm sections) descending from ground level adjacent the existing lift and stairs on the SW side of the station to a horizontal underpass lying c. 5600 mm below the level of the platform.

This ramp runs through the area currently used as a retention basis for storm water runoff from the adjacent carpark.

From the bottom end of this ramp, the underpass runs under Sydenham Road and the up end of the platform to emerge on the NE side of the lines with a switchback ramp (of 8 x 6000 mm sections) in an open area between the Telstra communication tower and existing station ramps. This delivers users c.60 m to the south of the existing station entry. The underpass is c. 50 m long.

A third ramp (of 13 x 6000 mm sections) runs from the mid-point of the underpass to deliver patrons to the far SE (up) end of the island platform.

The overall length of ramps and underpass is c. 190 m. There is a further c. 95 m of ramp from the underpass to the island platform.

In discussion with PTV and MTM at the initial Stakeholder consultation, it was agreed by all that due to the excessive ramp length required, particularly for the elderly and people with a disability, site drainage issues, issues surrounding potential local contaminated soil and the potential public safety risks associated with a long, unsupervised tunnel that this option was unfeasible and not to be pursued further.

Leaving options to upgrade the existing overpass.

2.3 Options – Over the permanent way

Three approaches suggest themselves to provide access over the permanent way:
• An all lift option – duplicating the three existing lifts
• An all ramp option and
• Hybrids of the above – the main version involving two external ramps with a lift to access the island platform

2.3.2 Three Additional Lifts

Duplicating the existing lifts is the most obvious approach to providing redundancy / contingency access to and across the station. There is some flexibility with the placement of these lifts but in each case, one position generally seems to recommend itself over the alternatives.

At the station entrances, new lifts can be located adjacent each of the existing entrance lifts. Subject to the final geometry of the lifts to be used, there appears to be sufficient space at both ends of the existing concourse to land a second lift.

Access to the island platform is more constrained. There does not appear to be anywhere adjacent the existing lift or on the existing concourse where a new lift could be placed without significant and deleterious effect upon the existing flow and function of the concourse.

The only suitable place is on the platform – on the up side from the stairs. To accommodate this, the existing concourse – complete with its glazed screen is to be extended. The concourse would extend to fill in the spaces on either side of the existing stairs and thence extend as a “U” to the new lift.

The new lift placement would require the relocation of the existing platform canopy and its associated furniture.

2.3.3 Additional Ramps and Central Platform Lift

After an all Lifts option, the next option is to replace lifts with ramps where these might be done easily i.e. outside the limits of the station but to keep a lift to the island platform.

The option is based upon providing two 1 in 14, 1.8m wide ramps – one on either side of the station – linking these into the existing stairs. This was a part of the original design – allowing the stairs and ramps to sit side by side – sharing the same landings at ground / platform and concourse levels.

As in the all Lift Option, the lift option requires an extension of the concourse and reconfiguration of the canopies.

On the NE (shopping centre) side, the ramp consists of 13 x 6 m sections for an over-all rise of c.5600 mm from platform level to the concourse. The rise from the street to the platform is provided by existing ramps. On the SW side, the ramp rises c. 7 m – 17 x 6 m sections – and is over 125 m in length.

2.3.4 Additional Three Ramps

The third option is that of 3 ramps consisting of a ramp at either station entrance (as per Option 2) and a third ramp on the island platform.

To install the required ramp on this platform at least one switch back is required. (The platform is not quite long enough to accommodate a single length ramp – being short by perhaps 3 m plus ramp run-off.) The difficulty that emerges is to maintain a 1.8m clear width between handrails on the ramp (and a zone on either side for screening on it) and maintain clearances at platform level to the coping.

In the layout as proposed, as the platform tapers a pinch point is reached where the width to the coping must be reduced to c. 3.1m. This “pinch” decreases as the ramp drops to platform level – opening out to c. 3.6 m at platform level.

The report also covered the suitability of lifts in general.

The current 12 person public lifts are smaller than is required by the current standard and are subject to vandalism.

Lift reliability is currently a problem because they operate publicly for 24 hours and are the only method of DDA entrance to and egress from the platform.

The additional lifts proposed in Option 1 & 2 will be larger 18 person lifts (3.5 x 3.5m footprint) and compliant with current design standards.

Discussion took place during the initial stakeholder meeting about whether new lifts should be introduced considering the maintenance issues associated with the existing 24 hour public use. The example of Coolaroo Station was given as a successful case where the introduction of duel public lifts works successfully. In addition, it was suggested that the majority of vandalism occurred within working hours as opposed to at night.

The current lift renewal programme was also discussed. It was noted that it could be 18 months before the existing lifts will be replaced and that some action will be required to improve reliability in the interim.

It was also noted that during the replacement of the existing lifts a means of temporary alternative access and egress will need to be provided. No solution to this was suggested, but Jacobs notes that it may be preferable to defer the upgrade of the existing lifts until after the installation of the alternative means of access considered in this study.

During the stakeholder meeting it was noted that by introducing ramps; the lifts may be turned off after hours, reducing maintenance and safety concerns, noting also that ramps are easier to install and of low maintenance comparatively to lifts. Ramps are likely to be less expensive over the long term however this is sensitive to maintenance costs.

Discussions took place around what would happen if no ramp upgrades occurred and lifts were closed at night. It was decided that removing an amenity that was previously provided would cause complaints and is not a suitable option.

Turning Lifts off after hours was generally accepted as an option that could be explored further.

And the costs of the three options:

3.2 Constructability and Whole of Life Costings
An estimate of the turn out and life cycle cost for the 3 options – out to 30 years – is attached as Appendix D.
In precis, the full lifts option is the cheapest in the short term, the full ramps the most expensive:
Option 1 – All Lifts $5,276,700.00 – immediate Capital Construction Cost.
Option 2 – 2 ramps + 1 lift $5,595,000.00 – immediate Capital Construction Cost.
Option 3 – All ramps $6,568,200.00 – immediate Capital Construction Cost.

When factoring in the costs to service and maintain each option for 30 years (non-discounted cashflow) the costs become:

Option 1 – All Lifts $9,868,230.00 – adding $4,591,530.00 (non-discounted $s) in costs over 30 yrs.
Option 2 – 2 ramps + 1 lift $7,661,793.00 – adding $2,066,793.00 (non-discounted $s) in costs over 30 yrs.
Option 3 – All ramps $7,632,994.00 – adding $1,064,794.00 (non-discounted $s) in costs over 30 yrs.

For the first 10 years Option 1 has the lowest WOL cost.
Between year 10 to year 29 Option 2 has the lowest WOL cost.
After 30 years Option 3 has the lowest WOL cost.

Next – the PTV Network Technical Standard Waiver.

PTV-NTS-002-W004 – Watergardens Dual Lift to Island Platform

Currently the central island platform (Platforms 2 and 3), Watergardens Station has DDA-compliant vertical transport with lifts and stairs, but the lifts have no operational redundancy. In the case of a lift failing, passengers with a DDA-accessible requirement would need to travel to the next accessible station and be provided with a taxi to return to Watergardens.

Up until 2017, lifts at Watergardens have not been reliable with many people having to travel to other stations to maintain access. In 2017 lifts at Watergardens were upgraded to increase their reliability lack of redundancy remained an issue.

Recently the State budget provided $8.9 million funding to provide for 3 lifts and increased concourse area at Watergardens Station. Design options for Watergardens were canvassed in a report by Jacobs on behalf of PTV: Watergardens Accessibility Study – Options Study – 02 December 2016.

Compared with the current arrangements, accessing the island platform (Platforms 2 and 3) requires a vertical change of about 5.6 metres above the platform. Normally this would trigger the need for a lift, stairs and a ramp (as opposed to two lifts).

However, providing a switchback ramp here with appropriate concourse modification, has been assessed as being a higher risk than providing a second lift with concourse modification. Providing a continuous grade (non-switchback) ramp would require platform extension, which would trigger expensive track work and will not be considered.

A Waiver is required to be provided to allow two lifts to be used in lieu of a lift, stairs and a ramp. Compliance with minimum platform width standard (MTM Structure and Facilities Standard (MCST 020 100-01)) cannot be achieved with either ramp or lift solutions. Ramp non-compliance would occur over a much longer length of the platform than a lift. This clearance will be subject to a Safety In Design Review once design has been completed. The lift non-compliance will need to be assessed further during detailed design and a potential subsequent MTM standards waver, separate to this application will need to follow process.

And the project requirements document.

Client Requirements Document
Watergardens Station Accessibility Upgrade
December 2018

As a part of the Public Transport Accessibility Improvements Program, several stations within the Metropolitan train network have been stated to receive upgrades in order to achieve compliance with current access guidelines for people with disabilities. Watergardens Station is identified as being in critical need of accessibility improvements. The reasons for this are summarised below:

• The current station has been prone to frequent lift failures causing reduced access to Patrons/Passengers and increased travel times. This has been attributed to unreliable lifts, lack of backup power systems and vandalism.
• With the concourse between the car park and shopping centre serving as a 24×7, primary access path for station patrons and general public alike, reliability issues with the lifts and vandalism lead to accessibility issues.
• The current issue is exacerbated as the lifts in the station are not complaint with DSAPT standards which raises major concerns with regards to safely accessing and moving casualties from the station.

There are some unpleasant customer experience complaints (from Jan 2017 to Oct 2018) against Watergardens Station regards to the DSAPT non-compliance station amenities. These complaints were lodged through MTM customer feedback system.

The main complaint topic is expressing the unpleasant reliability of the existing station lifts and inconvenience to enter and exit platforms when the lift/lifts are out of service. The other streams, one is about no level access or poor direct assistance for mobility impediment passenger boarding, and the other one is about inefficient/misleading notification to passenger with impediment.

If the concourse is inaccessible, the closest access path to cross the tracks is located about 750 meters on the Down side of the station and the other access is located about 1.5km from the station on the Up side of the station. There is no backup power supply for the existing three lifts.

Post retrieved by 92.247.181.17 using Inoreader/1.0 (+http://www.inoreader.com/feed-fetcher; 1 subscribers; )

The post The saga of lifts at Watergardens station appeared first on Waking up in Geelong.

]]>
https://wongm.com/2024/12/watergardens-station-lift-upgrades/feed/ 2 20153
Putting the computer system before the train https://wongm.com/2024/11/fleet-management-computer-system-rolllout-renumbering-railway-rolling-stock/ https://wongm.com/2024/11/fleet-management-computer-system-rolllout-renumbering-railway-rolling-stock/#comments Mon, 11 Nov 2024 20:30:00 +0000 https://wongm.com/?p=22415 Over the years there have been many examples were real world processes being squeezed to fit in with what a computer system can support. Well the railways are no stranger to this, as these examples show. Some background Locomotives all look the same, so it’s not like you can tell a train driver “you’re driving […]

The post Putting the computer system before the train appeared first on Waking up in Geelong.

Post retrieved by 92.247.181.17 using Inoreader/1.0 (+http://www.inoreader.com/feed-fetcher; 1 subscribers; )

]]>
Over the years there have been many examples were real world processes being squeezed to fit in with what a computer system can support. Well the railways are no stranger to this, as these examples show.

N455, N452, N470, N472, VLocity VL22 and VL80 stabled at Dudley Street

Some background

Locomotives all look the same, so it’s not like you can tell a train driver “you’re driving the red one today” – you need a way to tell them apart. Enter a favourite topic of trainspotters – numbering systems.

T320 at the Seymour Railway Heritage Centre

Each locomotive gets a number – and most of the time locomotives of the same type get numbered in the same series of numbers, and either the first few digits or some letters in front indicate the ‘class’ of locomotives.

And from there the numbers get to track maintenance for a given unit, and allocations of locomotives to a given service. Initially these processes were were all paper based, and undertaken by an army of clerks back at head office.


PROV image VPRS 12903/P0001, 287/09

But in the 1970s there was something new sweeping the world of business – computers.

And over time, railways around the world also decided to adapt their existing processes to the new world – but not without trouble.

Number shuffling at Australian National

In 1980s the Australian National Railways Commission – operator of freight and passenger trains from Adelaide towards Western Australia, Alice Springs, Broken Hill and Victoria – introduced the ‘Traffic Information Management System’ (TIMS) to make their railway more efficient.

Their 1984/1985 annual report stating

Implementation of AN’s computerised wagon monitoring system will dramatically increase utilisation of wagons and locomotives. A sub-system to maintain a comprehensive on-line rollingstock inventory was implemented in October 1984. Partial implementation of the remainder of the system occurred in July 1985, with full implementation due in December 1985.

As part of this, ‘check digits‘ were added to the existing fleet number of each locomotive, wagon and carriage, so that if a number was accidentally mistyped into the new system, the computer would know it was wrong, and prompt the user to correct it.


Australian National annual report 1985/1986

But there was also a problem – locomotives inherited from the South Australia Railways had been numbered as numeric ‘classes’ – where the class leader had the same number as the class name, for example ‘830’ class locomotive ‘830’ and ‘930’ class locomotive ‘930’ – and the new computer system was not able to handle the duplication.

So the solution for Australian National – renumber the class leaders! The next spare numbers were at the end of the existing number groups, so locomotive ‘830’ was renumbered to ‘875’, locomotive ‘930’ became ‘967’, and so on..

And a real doozy in New Zealand

The New Zealand Railways were a relatively early adopter of computers, with their ‘Traffic Monitoring System’ introduced in the 1970s.

Wikipedia has this to say about it.

On 12 February 1979, NZR introduced a computerised “Traffic Monitoring System” (TMS) nationwide. Implementation was completed in December 1980.

A pilot scheme of TMS began in 1973 on the Palmerston North – Gisborne Line between Woodville and Gisborne. TMS resulted in an 8 per cent improvement in wagon utilisation. In 1977, NZR decided to implement the system out across the entire network. Using dual IBM System/370 systems, one in active standby mode, the TMS system became a centralised system for tracking all wagon and locomotive movements.

As a result of the introduction of TMS, NZR identified that it could reduce its total wagon requirements by 10 per cent of its 1980 fleet, resulting in the withdrawal of many older wagon types. NZR later sold its expertise and some of the TMS software to Victorian Railways in Victoria, Australia and the State Rail Authority (SRA) in New South Wales, Australia.

But the historical New Zealand Railways locomotives classification scheme that relied on superscript characters (eg: DA and EW) didn’t work on the new computer system, so the classes were changed to machine readable uppercase characters (eg: DA and EW).

NZR locomotive DI 1102 runs around the train on the Weka Pass Railway at Waikari station

But that wasn’t the only change – the decision was also made the renumber the entire locomotive fleet, across new number groups, with new numbers, in a system completely unintelligible at first glance – four digit non-sequential numbers. An example is the DC class locomotives of 1979 – 85 were built as DC 1551 through 1599, but now operate as DC 4006 – 4951. So what gives?

The first secret behind the system is the meaning of each digit – the final one is a check number, giving DC class locomotives 400 through 495 – which sounds somewhat sensible, other than the fact only 85 DC class locomotives were ever built, so there’s 10 extra numbers in the series.

The answer to that mystery – I found it on a British railway forum, of all places.

The New Zealand check-digit system doesn’t work like the UIC/EVN system – it’s more complex, not least because it has to cope with vehicle classes which are letters, and variable-length numbers. The way it was explained to me (nearly 20 years ago, so it’s a bit hazy now) is that the check digit calculation can come up with a number between 0 and 10 – not 0 and 9 like the EVN. When it’s a 10, there’s no way to handle it in the computer system, so that number is just rejected and they skip to the next one. So, yes, there are gaps in the fleet number sequence, and that’s just how the system works. The New Zealanders are used to it, and don’t expect to have a continuous list of numbers.

So that’s two layers on indirection in the New Zealand rolling stock numbering system – my brain hurts.

KiwiRail DXR 8007 leads DXB 5120 on 736 northbound freight from Christchurch to Picton over the Awatere River bridge at Seddon on the South Island

Further tools

Post retrieved by 92.247.181.17 using Inoreader/1.0 (+http://www.inoreader.com/feed-fetcher; 1 subscribers; )

The post Putting the computer system before the train appeared first on Waking up in Geelong.

]]>
https://wongm.com/2024/11/fleet-management-computer-system-rolllout-renumbering-railway-rolling-stock/feed/ 1 22415
A history of smoking on Victorian trains https://wongm.com/2024/11/history-smoking-victorian-trains-railway-stations/ https://wongm.com/2024/11/history-smoking-victorian-trains-railway-stations/#comments Mon, 04 Nov 2024 20:30:00 +0000 https://wongm.com/?p=21652 Fortunately I’m young enough to have never suffered through the days of when people were allowed to smoke onboard trains in Victoria, but can remember when people were allowed to smoke at railway stations. So here is a quick history of when smoking bans were introduced. Back in the bad old days Going back the […]

The post A history of smoking on Victorian trains appeared first on Waking up in Geelong.

Post retrieved by 92.247.181.17 using Inoreader/1.0 (+http://www.inoreader.com/feed-fetcher; 1 subscribers; )

]]>
Fortunately I’m young enough to have never suffered through the days of when people were allowed to smoke onboard trains in Victoria, but can remember when people were allowed to smoke at railway stations. So here is a quick history of when smoking bans were introduced.

Pile of dumped cigarette butts in the Sunshine Marketplace car park

Back in the bad old days

Going back the very start of trains in Victoria, entire carriages were designated as ‘smoking’ and ‘non-smoking’.


VPRS 12800/P1, item H 4165

But with the introduction of electric suburban trains from 1919, carriages were divided up instead – three smoking and six non-smoking compartments, with a full length partition dividing the two.


Weston Langford photo

This layout was retained in Harris trains of the 1950s.

SLV image H31188 - Harris suburban train
SLV image H31188. Photographer unknown. Undated but circa 1956 to 1968.

Country trains also had separate smoking and non-smoking compartments – for example the ‘Z’ type saloon carriages divided into two sections, the first class carriages having 20 smoking and 28 non-smoking seats, while second class had 24 smoking and 40 non-smoking seats.


Rob O’Regan at www.robx1.com (002.AL633.b)

But in October 1971 thanks to the upcoming stainless steel ‘Hitachi’ trains, smoking and non-smoking accommodation on suburban trains was changed back to a whole carriage arrangement – ‘motor’ carriages being for smoking, and ‘trailer’ carriages non-smoking – which when usually marshaled in a 50/50 ratio, gave more space for smokers.


Weston Langford photo

And the start of smoking bans

15 November 1976 was a breath of fresh air for Melburnians – the state government banned smoking onboard all public transport vehicles.

7801T-30
Photo via GSWRHS Collection

In what might have been the first such ban in Australia.

Smoking will be banned on all Melbourne public transport from November 15.

The Minister for Transport, Mr Rafferty, said today that the ban would apply on all of the city’s electric trains, trams and government buses.

“I believe the great majority of the travelling, public will strongly support the decision”, he said.

The ban was designed to promote cleanliness, improve passenger comfort and reduce vandalism.

The NSW Minister for Transport, Mr Cox, said tonight that he ‘could see no point in “rushing in” with similar legislation for NSW without all points of view being considered.

Mr Cox said he was aware of “a certain resentment”. among smokers who could no longer smoke, particularly on long journeys.

The smoking ban was also welcomed by the Victorian Railways, as it made running their railway easier.

The banning of smoking on suburban trains, by Government request, as from 15 November 1976, has resulted in increased cleanliness at lower cost, greater comfort for the majority of passengers, and more flexible train operations because it is no longer necessary to consider the location of smoking compartments in the consists of trains. The ban has resulted in no detectable loss of patronage and must be regarded as a successful innovation.

December 1986 saw smoking banned from first-class V/Line carriages and onboard V/Line road coaches, then on 3 April 1989 smoking was banned from all V/Line trains.

The Victorian Government will ban smoking on all Victorian country trains from April 3.

The Transport Minister, Jim Kennan, announced the move yesterday. It follows a December 1986 decision to ban smoking in first-class sitting carriages and in V/Line road coaches.

Smoking was banned on Melbourne suburban public transport in 1978.

There had also been a progressive reduction in the capacity for smokers in economy-class carriages on V/Line’s intrastate rail services.

And now for stations

The opening of the City Loop in the 1980s appears to be another move towards smoking bans, if these Metropolitan Transit Authority-era ‘no smoking’ signs are anything to go by.

MTA-era 'no smoking' sign at Melbourne Central station

But it took until March 2006 for smoking bans to be introduced at outdoor railway stations.

No Smoking sign with the covered over 'in covered areas' section started to become uncovered

But these bans only applied to covered areas.

Smokers who light up under covered areas at Victoria’s train station platforms, tram and bus shelters will face a stiff fine from today.

Transport Minister Peter Bachelor said areas where smoking is prohibited include all spaces where the cover was specifically provided for sheltering people.

“A covered area means any part of a train platform, tram or bus shelter that has a roof overhead, regardless of its height,” Mr Batchelor said.

He said it did not include covered areas like shop awnings, verandahs or overhanging balconies where the cover is intended for use other than to shelter people waiting for public transport.

Mr Batchelor said complaints from commuters about people smoking under covered areas at train station platforms and tram and bus shelters prompted the government to change the law.

But a roof doesn’t make a difference to secondhand smoke on a station platform.

Advertising the new smoking bans at tram shelters and platforms from 1 March 2014

And so in 2014 the smoking bans were extended to the entire station platform and tram stop platform.

From Saturday 1 March 2014, all areas of train stations and raised platform tram stops will be smoke free, increasing the comfort for customers who travel on Victoria’s public transport network.

The new arrangements will extend the existing smoke free zones, which already include covered areas of train platforms and under covered tram and bus shelters.

The fine for smoking in a smoke free area on public transport is $212 for adults and $72 for children.

Signage and information at stations will help to raise public awareness of the extended smoke free areas.

The plague of vapes

Disposable vapes are a joke of a product, with a rechargeable lithium-ion battery inside that goes straight into the bin once the vape juice is used up, but for once the government is actually ahead of them from a legislative perspective – from 1 August 2017 laws were updated to ban the use of e-cigarettes in places smoking is also banned.

However updated signage didn’t start appearing at railway stations until 2022.

New and old 'no smoking' signage at Moe station

Footnote: other modes of transport

Interstate coach operators started introducing non-smoking buses from 1987.

Ansett Pioneer will ban smoking on some express coaches running daily between Melbourne, Sydney and Brisbane next month, after having tested the demand with three of its 11 daily each-way services between Canberra and Sydney for some time.

Deregulation under the Interstate Road Transport Act has resulted in eight non-smoking coach services a day between Canberra and Sydney, and there is also a direct non-smoking daily service between Canberra and Adelaide, with 10 coachlines taking up the trend around Australia. Greyhound, Redline, Skennars, Transborder and Central Australia Tours Association all have some fully non-smoking services, and others have services with smoking available only in allocated seats at the rear.

The new Ansett Pioneer service is being intro duced “because of public demand”, the general manager of operations, Mr David Raven, said yesterday.

It would be only on the Silver Service express, once daily between Melbourne, Sydney and Brisbane. If demand was sufficient, more would be introduced.

The president of Action on Smoking and Health. Mr Alan Shroot, said yesterday that proprietors were recognising the demand for smoke-free travel, and several state governments had legislated to ensure smoke-free urban bus and intrastate coaches and rail lines.

With smoking bans on aircraft also rolled out during this period.

The Australian Government banned smoking on all flights within Australia by domestic airlines in December 1987 and extended these domestic bans to all services operated by international carriers between airports within Australia from October 1990.

Footnote: an interstate straggler

Trains like the Indian Pacific and The Ghan travel for days across Australia, which might be a problem for a compulsive smoker.

Almost home: NR75 leads the Adelaide-bound Ghan through Two Wells

So in 1995 Australian National installed a small smoking compartment in the luggage vans of their trains, which remained available for passengers until 2006.

Smoking will soon be a thing of the past on the Ghan’s railway journeys between Adelaide and Darwin.

An enclosed area for smokers inside the lounge car will removed by October 1.

Great Southern Railways chief executive Tony Braxton-Smith says the company is responding to tougher smoking legislation across most of the country.

He says people will not be able to smoke even once The Ghan crosses into the Northern Territory, where there are few anti-smoking laws.

Post retrieved by 92.247.181.17 using Inoreader/1.0 (+http://www.inoreader.com/feed-fetcher; 1 subscribers; )

The post A history of smoking on Victorian trains appeared first on Waking up in Geelong.

]]>
https://wongm.com/2024/11/history-smoking-victorian-trains-railway-stations/feed/ 3 21652
Photos from ten years ago: October 2014 https://wongm.com/2024/10/photos-from-ten-years-ago-october-2014/ https://wongm.com/2024/10/photos-from-ten-years-ago-october-2014/#comments Mon, 28 Oct 2024 20:30:00 +0000 https://wongm.com/?p=22563 Another instalment in my photos from ten years ago series – this time it is October 2014. Trains I’ve been posting about progress on Regional Rail Link for a few years now, and finally it’s the big day – VLocity VL09 was the first “proper” test train to run along the new tracks from Deer […]

The post Photos from ten years ago: October 2014 appeared first on Waking up in Geelong.

Post retrieved by 92.247.181.17 using Inoreader/1.0 (+http://www.inoreader.com/feed-fetcher; 1 subscribers; )

]]>
Another instalment in my photos from ten years ago series – this time it is October 2014.

Trains

I’ve been posting about progress on Regional Rail Link for a few years now, and finally it’s the big day – VLocity VL09 was the first “proper” test train to run along the new tracks from Deer Park towards West Werribee.

VLocity VL09 headed along the RRL tracks at Deer Park Junction

However it wasn’t the actual first train to use the line – a few months earlier a super heavy “consolidation train” spent a few days driving back and forth along the line, simulating the load of multiple passenger trains in order to bed down the brand new track.

Also this month the brand new station at Waurn Ponds in Geelong’s southern suburbs opened.

6-car VLocity set awaiting departure time from Waurn Ponds

But it was a bare bones operation, with just a single platform, and a short siding down the line to allow terminating trains to shunt clear of services continuing to Warrnambool.

Holding siding for Waurn Ponds station, located west of Anglesea Road

Nearby Baanip Boulevard was also under construction – a link between the recently completed Geelong Ring Road and the Surfcoast Highway.

Looking east along Baanip Boulevard towards Ghazeepore Road and Waurn Ponds station

Since then Waurn Ponds gained a second platform in 2022, the short holding siding has been replaced by a six road train stabling yard past the cement works, and 8 kilometers of track between South Geelong and Waurn Ponds has been duplicated.

Terrorism scaremongering

A decade ago the government decided to ratchet up the National Terrorism Threat Level from medium to high, and in return the City Loop railway stations were blanketed in ‘If you see something, say something’ scaremongering.

'If you see something, say something' scaremongering blankets Flagstaff station

We also lost our rubbish bins at railway stations, and the recent installed lockers at Flinders Street Station were shut down.

Recently installed lockers at Flinders Street Station now out of use

The bins eventually returned but now see through, with the exception of Southern Cross Station, which still lacks them.

And things that are gone

A decade ago the LED matrix next train displays were still a common sight outside of the CBD.

When trains run late, the next train displays show them out of order

Since 2018 the majority of them have been replaced by modern LCD screens.

Next up, we have an Alstom Comeng arrives into an almost new West Footscray platform 1 with an up Sunbury service.

Alstom Comeng arrives into West Footscray with an up Sunbury line service

Now numbered platform 2, a third turnback platform has since been constructed as part of the Metro Tunnel project.

And finally, the view onboard an EDI Comeng train.

Onboard an almost empty EDI Comeng train

The windbreakers and 15 seats around the doors of each carriage were removed in 2015, to make more room for standing passengers.

Trams

I headed out to Victoria Gardens in Richmond to check out the new route 12 terminus – opened in July 2014 after route 112 from West Preston to St Kilda was split into route 11 from West Preston to Victoria Harbour, and route 12 from St Kilda to Victoria Gardens.

A1.248 and A1.239 shunt at the route 12 terminus at Victoria Gardens

Also ongoing was the rebuilding of recently completed tram stops in the Melbourne CBD so their platform heights met new standards.

Resurfacing works almost completed at the south end of the Southern Cross Station platform stop on Spencer Street

And in Ascot Vale I revisited a tram stop that landed me in the newspaper for tracking the ongoing procession of motorists who crashed into it.

Such a long time with no crashes - this time only three panels taken out

Buses

A decade ago Sita was still running clapped out high floor buses on services around Sunshine, complete with paper destination signs as they didn’t want spend the money updating the old fashioned destination blind.

Sita high floor bus #63 rego 2363AO on a route 428 service in Sunshine

While a much more salubrious bus service was the privately operated ‘SuitJet’ express bus to the Melbourne CBD.

'SuitJet' liveried Cobb and Co coach #352 rego 9054AO at William and Little Collins Street

Launched in August 2014 with services from Point Cook, Eltham, Doreen, Mernda and Templestowe, there were few takers for the $30 return fare, and the service shut down a few weeks later.

And something else

Something that always intrigued me was the handful of houses left standing in the middle of the Victoria University car park in Footscray.

David Street used to be lined with houses, now just a car park

I eventually got around to writing about them in 2018, only for the State Government to announce in 2019 that the new Footscray Hospital would be built on the site. Today the houses are gone, replaced by a 10-storey glass and concrete tower.

Footnote

Here you can find the rest of my ‘photos from ten years ago‘ series.

Post retrieved by 92.247.181.17 using Inoreader/1.0 (+http://www.inoreader.com/feed-fetcher; 1 subscribers; )

The post Photos from ten years ago: October 2014 appeared first on Waking up in Geelong.

]]>
https://wongm.com/2024/10/photos-from-ten-years-ago-october-2014/feed/ 5 22563
Taking a sneak peek at Anzac station https://wongm.com/2024/10/metro-tunnel-anzac-station-open-day/ https://wongm.com/2024/10/metro-tunnel-anzac-station-open-day/#comments Mon, 14 Oct 2024 20:30:00 +0000 https://wongm.com/?p=22546 On the weekend the Metro Tunnel project held a limited public open day for local residents at the recently completed Anzac station, and I was lucky enough to be able to take a look. So let’s head inside! Headed in The open day was held on the closed off section of Domain Road, east of […]

The post Taking a sneak peek at Anzac station appeared first on Waking up in Geelong.

Post retrieved by 92.247.181.17 using Inoreader/1.0 (+http://www.inoreader.com/feed-fetcher; 1 subscribers; )

]]>
On the weekend the Metro Tunnel project held a limited public open day for local residents at the recently completed Anzac station, and I was lucky enough to be able to take a look. So let’s head inside!

Anzac station open day signage on St Kilda Road

Headed in

The open day was held on the closed off section of Domain Road, east of Anzac station.

Future eastbound tram stop on Domain Road

With food stalls.

Food stalls along Domain Road for the Anzac station open day

And kids activities.

Photo frame cutouts at the Anzac station open day

Including a train ride.

'Kids' clarification added to the train signage at the Anzac station open day

But the reason I was there was to see inside Anzac station itself.

Domain Road entrance to Anzac station

Touring the station

We headed downstairs.

Headed down the steps at the Domain Road entrance to Anzac station

The Domain Road entrance having a single up escalator and a flight of stairs.

Single escalator and steps at the Domain Road entrance to Anzac station

As well as a lift, that doubled as a light well.

Lift at the Domain Road end of the unpaid area concourse at Anzac station

We were then greeted by the unpaid area concourse, which passes beneath St Kilda Road.

Domain Road end of the unpaid area concourse at Anzac station

And the tram stop above.

Atrium at Anzac station, bridge linking the two tram stop platforms

A trio of escalators and a lift connect the station concourse to the south end of the tram stop.

Trio of escalators and lift at the southern tram stop entrance to Anzac station

And a single escalator, steps and lift to the northern end.

Single escalator, steps and lift at the northern tram stop entrance to Anzac station

The unpaid area walkway then continued west to the station entrance on Albert Road.

Albert Road end of the unpaid concourse at Anzac station

With a pair of escalators.

Pair of escalators and steps at the Albert Road entrance to Anzac station

Along with a lift.

Lift at the Albert Road entrance to Anzac station

Down to the platforms

Now it was time to head down to the platforms.

Customer service counter and Myki gates at the entrance to Anzac station

Obviously no trains running.

PIDS on the concourse at the Albert Road entrance to Anzac station

But the passenger information screens had been installed.

PIDS outside the main entrance to Anzac station

Through the ticket gates.

Two banks of Myki gates at the exit from the paid area at Anzac station

With sunlight still streaming in from the glass roof above.

Looking out from the paid area towards the atrium at Anzac station

We went past the pair of lifts down to platform level.

Pair of lifts and escalators down to the north end of the platforms at Anzac station

And took the escalators down instead.

Steps and pair of escalators to the north end of the Anzac station platforms

A wide island platform greeting us.

Platform level at Anzac station, looking south

But still no trains.

PIDS on the platform at Anzac station

Temporary fencing in place across the platform screen doors, with a demarcation still in place between active rail tunnels and the under construction railway station.

Temporary fencing in place across the platform screen doors at Anzac station

But network ‘strip maps’ already displayed.

Network 'strip map' for the Sunbury bound platform at Anzac station

Along with customer help points.

Customer help point on the platform at Anzac station

The big orange pendant light fittings also a design feature.

Pendant light fittings at platform level at Anzac station

Along with the orange ceiling details.

Platform level at Anzac station, looking north

It was then time to head back out again, so we took a trio of escalators back to the concourse.

Trio of escalators at the south end of the platform at Anzac station

And then back out of the same ticket gates we entered through.

Two banks of Myki gates at the exit from the paid area at Anzac station

Past the customer service counter.

Customer service counter beside the Myki gates at Anzac station

Past the hidden away back of house area.

Entrance to the back of house area at Anzac station

Back down the unpaid concourse towards Domain Road.

Domain Road end of the unpaid concourse at Anzac station

Back up the escalator.

Escalator and stairs at the Domain Road entrance to Anzac station

And back into the sunlight.

Wayfinding signage at the Domain Road entrance to Anzac station

Ending the tour.

Footnote: a few other things I noticed

Anzac station isn’t completely finished yet – the retail spaces are still taken up by temporary facilities for construction workers.

Temporary staff toilets built into a future retail space on the concourse at Anzac station

With a few bits of wall cladding also missing.

Wall cladding still to be installed along the Domain Road end of the unpaid area concourse at Anzac station

I also noticed a separate set of stairs beside the Domain Road entrance.

Firefighter access stairs beside the Domain Road entrance to Anzac station

Locked away from public use, for firefighter access in case of emergency.

Firefighter access stairs beside the Domain Road entrance to Anzac station

I also found a second lift door hidden away at the back of the Domain Road lift – presumably it leads into the back of house area of the station.

Second lift door to the back of house area at the Domain Road entrance to Anzac station

And on Domain Road the tram tracks have been rebuilt, with new platform stops installed – despite route 58 trams still using the tracks along Toorak Road West they were diverted along back in 2017 to make way for the construction of Anzac station.

Future westbound tram stop on Domain Road

Post retrieved by 92.247.181.17 using Inoreader/1.0 (+http://www.inoreader.com/feed-fetcher; 1 subscribers; )

The post Taking a sneak peek at Anzac station appeared first on Waking up in Geelong.

]]>
https://wongm.com/2024/10/metro-tunnel-anzac-station-open-day/feed/ 21 22546
Melbourne’s transit orientated fast food restaurants https://wongm.com/2024/10/melbourne-transit-orientated-fast-food-restaurants/ https://wongm.com/2024/10/melbourne-transit-orientated-fast-food-restaurants/#comments Mon, 07 Oct 2024 20:30:56 +0000 https://wongm.com/?p=22498 Melbourne might not do a very good job of transit orientated development, but one thing we can do is transit orientated fast food. McDonald’s The McDonald’s in the Melbourne Central basement food court station has a serving window facing onto the concourse at Melbourne Central station. While the Box Hill Central outlet takes it a […]

The post Melbourne’s transit orientated fast food restaurants appeared first on Waking up in Geelong.

Post retrieved by 92.247.181.17 using Inoreader/1.0 (+http://www.inoreader.com/feed-fetcher; 1 subscribers; )

]]>
Melbourne might not do a very good job of transit orientated development, but one thing we can do is transit orientated fast food.

Welcome to Suburbia

McDonald’s

The McDonald’s in the Melbourne Central basement food court station has a serving window facing onto the concourse at Melbourne Central station.

McDonalds window facing the Swanston Street concourse of Melbourne Central

While the Box Hill Central outlet takes it a step further – a serving window facing into the paid area at Box Hill station.

McDonald's serving window facing into the paid area at Box Hill

McDonald’s logo on the station signage.

McDonald's logo featured on the Metlink signage at Box Hill Station

And the McDonald’s dining room has next train displays on the wall inside.

Next train displays inside the McDonald's dining room at Box Hill

Red Rooster

It’s not just McDonald’s located in stations – Red Rooster at Southern Cross Station has a “Walk Thru”.

Future

A glass wall separating their counter into paid and unpaid sections.

Red Rooster store at Southern Cross now has a glass wall between the paid and unpaid sections

And a failure

At Melbourne Central Station there is also a KFC service window facing into the Elizabeth Street concourse.

Abandoned KFC service window facing into the Elizabeth Street paid area at Melbourne Central Station

But thanks to it being a dead end for passengers, it has since been abandoned.

KFC service window now boarded up, facing into the Elizabeth Street end paid area at Melbourne Central Station

(Also blocking the view of the Geoff Hogg mural.)

Footnote: an interstate example

Brisbane Central station also has a fast food outlet inside it’s paid area – a McDonald’s.

McDonalds on the concourse at Brisbane Central station

Post retrieved by 92.247.181.17 using Inoreader/1.0 (+http://www.inoreader.com/feed-fetcher; 1 subscribers; )

The post Melbourne’s transit orientated fast food restaurants appeared first on Waking up in Geelong.

]]>
https://wongm.com/2024/10/melbourne-transit-orientated-fast-food-restaurants/feed/ 4 22498
Fixing a pigeon poo problem at Sunshine station https://wongm.com/2024/10/fixing-a-pigeon-poo-problem-at-sunshine-station/ https://wongm.com/2024/10/fixing-a-pigeon-poo-problem-at-sunshine-station/#comments Mon, 30 Sep 2024 21:30:00 +0000 https://wongm.com/?p=22528 Over the years I’ve noticed that pigeon poo has been piling up at Sunshine station thanks to a poorly designed building – but a decade after the station was completed, Metro has come back to address it. Some history For years Sunshine station only had a crappy timber shelter on the citybound platform, accessed via […]

The post Fixing a pigeon poo problem at Sunshine station appeared first on Waking up in Geelong.

Post retrieved by 92.247.181.17 using Inoreader/1.0 (+http://www.inoreader.com/feed-fetcher; 1 subscribers; )

]]>
Over the years I’ve noticed that pigeon poo has been piling up at Sunshine station thanks to a poorly designed building – but a decade after the station was completed, Metro has come back to address it.

Siemens 844M arrives into Sunshine on the up

Some history

For years Sunshine station only had a crappy timber shelter on the citybound platform, accessed via a dank pedestrian underpass.

Station building at Sunshine platform 1

But in 2009 the ‘Regional Rail Link’ project was given the go ahead, rebuilding the station.

Work on the eastern side of the new overhead concourse

Meet the idiots who feed birds

Unfortunately the designers of the new Sunshine station didn’t count on the idiots who like to feed birds.

Pigeons eating bread some bird feeding dimwit has dumped on the platform at a railway station

Attracting pigeons who use the roof structure as a perch.

Pigeon looks out from a wall covered with bird poo at Sunshine station

As well as the steel beams beneath the concourse.

Pigeon looks out from a steel beam covered with bird poo at Sunshine station

Their poo falling down onto the walls below.

Bird poo covers the walls at Sunshine station thanks to a poorly designed roof providing the perfect home for birds

The steps up to the station.

Bird poo covers the steps into Sunshine station thanks to a poorly designed roof providing the perfect home for birds

The station platforms.

Sunshine platform 4 covered in pigeon crap thanks to the exposed station concourse trusses forming a perfect home for birds

But luckily not this seat.

Bird poo covers Sunshine platform 3 thanks to a poorly designed roof providing the perfect home for birds

Time to fix it

Last week a crew turned up with a boom lift, ready to access the underside of the station concourse.

Vercon Construction Group install bird spikes on the east end of the Sunshine station concourse

Along with scaffolding the access the roof.

Scaffolding set up across the west entrance to Sunshine station so bird spikes can be installed

Mopping up the years of accumulated bird crap.

Scaffolding set up across the west entrance to Sunshine station so bird spikes can be installed

Installing bird spikes beneath the concourse structure.

Newly installed bird spikes on the east end of the Sunshine station concourse

And on top of exposed surfaces.

Bird spikes installed atop the light fittings around the west entrance to Sunshine station

The result – the pigeons now have to fly elsewhere.

Pigeon tries to land atop the west entrance to Sunshine station, their previous perch now covered in spikes to prevent the station being covered in bird poo

Perched on bits of the station where hopefully the falling poo won’t make such a mess.

Pigeons atop the west entrance to Sunshine station, their previous perch now covered in spikes to prevent the station being covered in bird poo

But unfortunately the work hasn’t addressed the root cause of the problem – I found pigeons eating fresh bird seed on the concrete right around the corner.

No wonder Sunshine station is covered in pigeon poo - some moron keeps feeding them

Footnote: Sunshine isn’t the only troublesome station

Footscray station was also rebuilt as part of the Regional Rail Link project, and the concourse there also has a pigeon perch – but the poo there just falls onto the tracks.

Pile of bird shit beneath the concourse at Footscray station

But no such luck at West Footscray station – there the poo lands right in the middle of the station entrance.

Pile of bird shit beneath the poorly designed roof at West Footscray station

Post retrieved by 92.247.181.17 using Inoreader/1.0 (+http://www.inoreader.com/feed-fetcher; 1 subscribers; )

The post Fixing a pigeon poo problem at Sunshine station appeared first on Waking up in Geelong.

]]>
https://wongm.com/2024/10/fixing-a-pigeon-poo-problem-at-sunshine-station/feed/ 4 22528
Photos from ten years ago: September 2014 https://wongm.com/2024/09/photos-from-ten-years-ago-september-2014/ https://wongm.com/2024/09/photos-from-ten-years-ago-september-2014/#comments Mon, 23 Sep 2024 21:30:00 +0000 https://wongm.com/?p=22467 Another instalment in my photos from ten years ago series – this time it is September 2014. Regional Rail Link Yep, I’m at it again, following the progress on the Regional Rail Link project. At Footscray the widened railway cutting through Fordham Reserve had been partially reinstated. Right up to abandoned Franco Cozzo showroom. The […]

The post Photos from ten years ago: September 2014 appeared first on Waking up in Geelong.

Post retrieved by 92.247.181.17 using Inoreader/1.0 (+http://www.inoreader.com/feed-fetcher; 1 subscribers; )

]]>
Another instalment in my photos from ten years ago series – this time it is September 2014.

Regional Rail Link

Yep, I’m at it again, following the progress on the Regional Rail Link project.

At Footscray the widened railway cutting through Fordham Reserve had been partially reinstated.

Fordham Reserve partially reinstated atop the RRL cutting

Right up to abandoned Franco Cozzo showroom.

Patch of green retained between the RRL cutting and land acquired for the track expansion

The backdrop is now filled with new apartment blocks, and the Franco Cozzo site has been turned into the Moon Dog brewery.

While down the line, trees marked the fenced off site of what used to be David Matthews Park.

Trees from the former David Matthews Park still in place, but everything is fenced off

That park has since been sold off for development.

Out in Albion brand new steel noise walls line the rail corridor parallel to Forrest Street.

Steel noise walls line the railway parallel to Forrest Street

A decade later they’re now hidden behind a row of gum trees.

A short distance away at Ardeer station a gravel platform welcomed passengers – along with a two hour wait for the next train, a mere 15 kilometres from the Melbourne CBD.

Ardeer station now hidden on both sides by steel noise walls

Thankfully the platforms have since been resurfaced with asphalt, and trains now stop every 20 minutes.

And finally – work had finally started at the future site of Caroline Springs station.

Earthworks at what looks to be the future site of Caroline Springs station

The station was eventually opened to passengers in January 2017.

Terrorism fears

In September 2014 Public Transport Victoria yanked the rubbish bins from Melbourne railway stations as a response to the “increased terror alert level”.

Rubbish and recycling bins removed from Flinders Street Station

With the response from slovenly passengers being to just throw their rubbish on the ground instead.

Rubbish bins also removed from Flagstaff station

The bins eventually returned in March 2015 as transparent plastic bags that resembled a scrotum, with the exception of Southern Cross Station – where they have never returned.

Penalty Fares scaremongering from PTV

August 2014 was the introduction of a new on-the-spot ‘Penalty Fares’ regime.

PTV advertising the new on-the-spot 'Penalty Fares' regime at North Melbourne station

It allowed passengers caught travelling without a without a valid ticket to pay an on-the-spot penalty fare of $75 by credit card, instead of being issued with a $223 infringement notice that arrived in the mail a few weeks later.

More PTV advertising at Southern Cross Station for the new on-the-spot 'Penalty Fares' regime

As you might expect, fare evaders worked out it was cheaper to just pay the $75 penalty if you did get caught, and so the scheme was terminated in January 2017.

More Melbourne Airport Rail Link propaganda

With the lead up to the 2014 State Election, the Napthine Government ramped up their ‘Moving Victoria’ campaign, promoting their unfunded ‘Melbourne Rail Link‘ project.

'From plane to train in 25 minutes' propaganda for the soon abandoned 'Melbourne Airport Rail Link' project at Southern Cross Station

Covering Southern Cross Station with ‘From plane to train in 25 minutes’ propaganda.

'Step towards the future Melbourne Airport Rail Link' propaganda on the main steps to the Bourke Street bridge at Southern Cross Station

On the big screen at Flinders Street Station.

The unfunded rail link to Melbourne Airport is also feature in the 'Moving Victoria' campaign propaganda

Plastering propaganda stickers on the back of train seats.

'Moving Victoria' propaganda stickers on the back of train seats, spruiking the Melbourne Rail Link project

On signs at railway stations.

'Building a rail line to Melbourne Airport' propaganda at Albion station

And on billboards, like this one beside Ballarat Road in Albion.

Alstom Comeng 602M departs Albion station

But as you might have guessed, the Melbourne Rail Link project went nowhere, construction of the Metro Tunnel started a few years later and is almost finished, and work on the Melbourne Airport Rail project has been stop-start.

Level crossings that are gone

Level crossing removals in Melbourne were few and far between, so I didn’t think much about it when I photographed an X’Trapolis train departing Bayswater station on the Belgrave line.

X'Trapolis 137M departs Bayswater station on the up

Or this Comeng train departing Essendon station on the Craigieburn line.

EDI Comeng 473M heads for the city, crossing the Buckley Street level crossing at Essendon

But in 2017 the level crossings at Mountain Highway and Scoresby Road at Bayswater were replaced with rail under road bridges, and in 2018 the Buckley Street level crossing in Essendon was replaced by a road under rail bridge.

Before the West Gate ‘Tunnel’

Another project that didn’t exist a decade ago was the West Gate ‘Tunnel’.

Dynon Road through West Melbourne used to be two lanes in each direction.

SkyBus articulated bus #95 rego BS00OH heads across the Dynon Road bridge

With an empty paddock beside the railway bridge.

Former site of the Creek Siding, this section is now open space

And you could see the sky above Footscray Road.

Transdev bus #439 rego 9039AO heads west on Footscray Road towards the depot at Footscray

But now all three sites are covered by a tangle of freeway overpasses forming what is supposedly a ‘tunnel’, unsolicited proposal conceived by Transurban as a way to increase profits to their shareholders.

V/Line around the place

Just another view of Southern Cross Station, with work on the 699 Bourke Street development underway.

VLocity VL18 and classmate head into Southern Cross platform 8 via the new Country Bypass track

Since then the original purple and green VLocity livery is no more, and only a single Sprinter railcar is left in the red and yellow ‘cheeseburger’ livery.

Locomotive hauled carriages were also still being shunted out on peak hour runs.

Three shunters wave to the driver as carriage set SSH26 is moved across to the platforms at Southern Cross

The last of the H sets was withdrawn in February 2024, with the N sets soon to follow.

The one thing I did expect to see go was A66 leading a Shepparton service through Moonee Ponds.

A66 leads a late running down Shepparton service through Moonee Ponds

The fleet of A class locomotives are now with railway heritage groups, and the Shepparton service has been exclusively VLocity trains since 2022.

Ding ding on the trams

The brand new E class trams entered service in November 2013, and were now starting to dominate route 96 services.

E.6005 picks up citybound route 96 passengers at South Melbourne

The older D2 class trams being demoted to route 19 services, including one plastered in ‘E class trams on route 96’ advertising.

D2.5004 advertising new E class trams on route 96, but headed south  on route 19 along Elizabeth Street towards Flinders Street

The tram allocations are the same today, despite the low floor trams lacking any platform stops on Sydney Road.

Melbourne’s prototype high floor light rail vehicles from 1985 were also still in service.

B1.2002 heads east on route 11 at Collins and Spencer Streets

Both were withdrawn a few years later, and eventually scrapped.

Speaking of platform stops, the only recently constructed tram stops in the Bourke Street Mall were closed, so they could rebuilt to a revised platform height.

Platform stop resurfacing works at Bourke and Elizabeth Streets

The Colonial Tramcar Restaurant was still trundling around the streets of Melbourne.

SW6.935 heads back into the city along Clarendon Street in South Melbourne

The service last ran in October 2018, when Yarra Trams banned the fleet of the network citing safety concerns.

Another W class tram had been turned into the ‘Tram Bar‘ at the Arts Centre.

SW6.969 converted in a bar, located outside the Arts Centre

Opened in 2011, the tram came and went with the seasons, until permanently closed in January 2015.

And finally, what was then an unremarkable photo of trams at Domain Interchange on St Kilda Road.

Z3.123 stops in the side platform at Domain Interchange with a southbound route 8 service, as a classmate continues down St Kilda Road

Rebuilt in 2013 at great expense to modern accessible standards, in 2018 the interchange was closed to make way for the construction of Anzac station, with route 58 trams being diverted onto a new alignment via Toorak Road, pending the completion of a replacement tram stop in December 2022.

And forgotten bus companies

I didn’t realise it at the time, but a decade ago I photographed a long list of bus companies that no longer exist.

Sita Bus Lines used to use plain white buses on the route 400 service to Melbourne’s prisons.

Sita bus #129 rego BS00BT outside Ardeer station on route 400 to Laverton

They were bought by Transit Systems in 2019, but their clapped out poo brown and orange buses can still be seen the western suburbs.

East West Bus Company once ran bus sources in the northern suburbs, as a joint venture between Dysons Group and Reservoir Bus Company.

East West Bus Lines bus #809 rego 7379AO on a route 561 service along Newlands Road

The joint venture was taken over by Dysons in February 2014, with the East West brand phased out in 2019.

Tullamarine Bus Lines once ran bus routes around Moonee Ponds and Airport West.

Tullamarine Bus Lines #22 rego 1122AO on a route 477 service arrives at Essendon station

They were acquired by ComfortDelGro Corporation in 2018, and merged into the operations of CDC Melbourne.

Moonee Valley Coaches was another bus operator in the inner north.

Moonee Valley Coaches bus #78 rego 2278AO on route 503 at Essendon station

They were acquired by Dyson Group in 2024.

Kastoria Bus Lines is another smaller operator in the north-western suburbs.

Kastoria Bus Lines bus #49 rego BS00AX on route 476 at Essendon station

They lost out in the recent Metropolitan Zero Emission Bus Franchise process, and will be taken over by CDC Melbourne from 2025.

I also found a Melbourne Visitor Shuttle bus on St Kilda Road.

Melbourne Visitor Shuttle bus #78 rego 6678AO turns from Domain Road onto St Kilda Road

Funded by the City of Melbourne, the service was discontinued in 2017 after competition from the Free Tram Zone.

And City Sightseeing Melbourne once ran a hop-on hop-off tourist service with open-top double decker buses.

Melbourne City Sightseeing bus 9353AO pauses outside the National Gallery of Victoria on St Kilda Road

They suspended operations in March 2020 thanks to Covid-19, and are yet to restart operations.

And a final word

Remember Melbourne Bike Share, with bikes that needed to be pedaled, and docks to return them to?

Melbourne Bike Share users head down a bike lane

The service was withdrawn in 2019.

And what about yellow taxis?

New and old: original yellow taxi beside a new silver one

A common sight since introduced by Jeff Kennett in the 1990s, the requirement was dropped in 2013 as part of the legalisation of Uber and other so called “ridewhare” services.

Footnote

Here you can find the rest of my ‘photos from ten years ago‘ series.

Post retrieved by 92.247.181.17 using Inoreader/1.0 (+http://www.inoreader.com/feed-fetcher; 1 subscribers; )

The post Photos from ten years ago: September 2014 appeared first on Waking up in Geelong.

]]>
https://wongm.com/2024/09/photos-from-ten-years-ago-september-2014/feed/ 16 22467