Posts Tagged ‘truth and lies’

Fact check on the Frankston line

On August 1st trains returned to the Frankston line after a five week long shutdown that allowed the tracks to be lowered beneath Centre, McKinnon and North Roads, eliminating three level crossings. A media release was released by the State Government to celebrate the completed works, but the ‘facts’ included within deserve further examination.